Buscar
Mostrando ítems 41-50 de 147
Improve the Cycle Time of Stat Testing in Quality Control Laboratory Applying Kaizen Analysis
(Polytechnic University of Puerto Rico, 2013)
Quality Control Laboratory of
Biopharma Company was selected for develop a
design project, using the technique of Kaizen
Project. Manufacturing area of Biotech Company
produces a biological product. Biologic Bulk ...
Validation Analysis of a Plastic Shrinkage Process after an Injection Molding Operation
(Polytechnic University of Puerto Rico, 2013)
A validation process is essential during
the start up of a new mold to ensure that the
product will fulfill the function for which it was
created. One common problem for production is
finding the right parameters to ...
Automation of Final Test Station in the Manufacturing Process of a Medical Device Facility
(Polytechnic University of Puerto Rico, 2013)
The IS-4 Final Test Station will
incorporate the entire test needed to assure that the
leads that are manufactured in Boston Scientific
are built with a high quality standard that will
assure the safety of the patient. ...
Manufactura Esbelta en los Servicios de Limpieza de Cuartos en la Industria Hotelera
(Polytechnic University of Puerto Rico, 2013)
La manufactura esbelta (lean
manufacturing) es una forma de gestión de
procesos que permite a las empresas adaptarse
fácilmente a las condiciones cambiantes del mundo
globalizado. Su aplicación es diferente en ...
Disaster Recovery Plan Creation for GiveChance Foundation
(Polytechnic University of Puerto Rico, 2013)
GiveChance Foundation is a non-profit
Foundation created for helping children born with
health problems through the help of sponsorship.
The Foundation helps serve children from a week
born up till the age of 13, having ...
Optimizing the Cubuy Water Treatment Plant for Achieving the Long Term 2 Enhanced Surface Water Treatment Rule Requirements
(Polytechnic University of Puerto Rico, 2013)
The Long Term 2 Enhanced Surface
Water Treatment Rule is requiring additional
removal or inactivation of Cryptosporidium Oocyst
for public drinking water system. The Cubuy Water
Treatment Plant needs to provide an ...
Continuous Improvement in the Retention and Employment Placement – Link Between Both Processes
(Polytechnic University of Puerto Rico, 2013)
For the last decade, the socialeconomic factors as violence, underground
economy, the poverty level of living, high
unemployment, generations depending on subsidies
fund from the United States, has negatively
impacted ...
Risk Prevention in Syringe Filling Line in a Pharmaceutical Manufacturing Plant
(Polytechnic University of Puerto Rico, 2013)
Risk prevention in syringe filling line
can be achieved through the implementation of
“Defense in Depth” concepts. Defense in Depth is
based on the integration of 3-layers of operational
controls which are Equipment, ...
Finished Goods Failure Reduction in a Wound Closure Medical Device Product Family
(Polytechnic University of Puerto Rico, 2013)
A corrective action and preventive
action plan was developed to address the increase
of Finished Goods failures in a wound closure
medical device product family. Following a DefineMeasure-Analyze-Improve-Control Six ...
IT Governance and Internal Controls to Comply with Laws and Regulations
(Polytechnic University of Puerto Rico, 2013)
Laws and Regulations affect how
Organizations conduct their day to day operations.
Before implementing any type of procedures,
organizations must be aware of these regulations. In
those cases were procedures are ...