Buscar
Mostrando ítems 141-148 de 148
Productivity Increase on Manufacturing Line A
(Polytechnic University of Puerto Rico, 2022)
In company that shall remain anonymous, Manufacturing Line A was underperforming, often falling back in orders. Therefore, the company decided to put in place a project to look at increasing productivity in this high-mix ...
Improving micromanagement methods used in a software engineering organization
(Polytechnic University of Puerto Rico, 2022)
Management groups within businesses are constantly striving to implement new methods of tracking tasks. Micromanagement has become a popular method in modern times because of the level of detail that this method can manage. ...
Damaged cable solution on F-35 electric motor on Aerospace Industry
(Polytechnic University of Puerto Rico, 2022)
Broken wires on the electromagnetic motor of the F-35 aircraft is a problem that negatively impacts the production line. Each
broken wire defect is equivalent to a loss of $6,000. The major causes of these broken cables ...
Tracking Construction Documents Development Process in an Architecture & Engineering Firm
(Polytechnic University of Puerto Rico, 2021)
A local Architecture & Engineering firm needed to evaluate current option to track the Construction Documents Development Process. They wanted to know what new technologies or strategies are available to reduce production ...
Drug Product Process Development Storage Capacity at Amgen’s AML7x
(Polytechnic University of Puerto Rico, 2021)
The project aimed to increase the storage capacity for the drug product process development team in AM17x building at Amgen.
Storage process and operation improvements were identified through the use of the lean concept. ...
Reducción de ausentismo de empleados en un proyecto de construcción de vía rápida
(Polytechnic University of Puerto Rico, 2021)
Los proyectos de construcción de vía rápida son un modelo de contratación en el que el diseño del proyecto y la ejecución de la obra se realizan casi en forma paralela. A lo largo de dos meses, una empresa de construcción ...
Desarrollo de un Sistema de Control de Inventario y Mantenimiento de Equipos
(Polytechnic University of Puerto Rico, 2021)
Como parte de la gestión de incorporar equipo dentro de unas nuevas instalaciones, se desarrolló un sistema de control
de inventario y mantenimiento dentro de un almacén de una agencia militar. Las cinco fases de la ...
Past Due Reduction on 37mm Syringe Filters Manufacturing Line
(Polytechnic University of Puerto Rico, 2021)
In Pall Life Sciences Puerto Rico, the past due on the 37mm manufacturing line was at $262,000 and continues increasing. The root cause for this issue is due to a mix of material shortage and customer demand increase. After ...