Improvement to the Manufacturing Process for Screens
(Polytechnic University of Puerto Rico, 2020)
A company that fabricates screens, among other products, is not very effective as the manufacturing time of screens is longer than it is desired. The company wants to make changes to the current process and layout, focusing ...
Cost Effective Analysis of a Damaged Manufacturing Equipment
(Polytechnic University of Puerto Rico, 2020)
A fire in a production line of a chemical plant in Guymon, Oklahoma, caused damaged to a manufacturing pressure vessel. A
cost analysis was performed to determine if the pressure vessel needed to be repaired or replaced. ...
Subcon Report Automation
(Polytechnic University of Puerto Rico, 2020)
This project consists of the automation of a report that is done manually on a daily basis at the Finance Department of an aerospace company in Aguadilla, Puerto Rico. By automating the report generation, it is expected ...
Optimization of the Induction Solutions Preparation and Addition Process in Bulk Manufacturing at a Biopharmaceutical Plant
(Polytechnic University of Puerto Rico, 2020)
An optimization of the induction solutions manufacturing and addition processes, used during the protein generation in a Cell
Culture process is pursued at a Biopharmaceutical plant located in Juncos, Puerto Rico. ...
Implementación de sistema de control de inventario con RFID
(Polytechnic University of Puerto Rico, 2020)
En una compañía de implementación de sistemas y venta de equipos, como impresoras y dispositivos portátiles para logísticas entre otros, requiere como parte de su reestructuración contar con un sistema de control de ...
Medical Procedure Packs Missing Components Reduction
(Polytechnic University of Puerto Rico, 2020)
The project took place in a medical device company that manufactures custom procedure packs. During the pack assembly
process, components may be left out of the pack which causes the assembly process to stop to rework ...
Reduction in lead times of manufacturing Product X
(Polytechnic University of Puerto Rico, 2020)
The project takes place in an Aerospace Company in Puerto Rico. The purpose of it was to reduce the lead times of a specific
product called Product X, the product that will benefit the company the most. Qualitative ...
Solving a Problem of Delays in a Work Team
(Polytechnic University of Puerto Rico, 2020)
This project analyzes the work environment in a team that present delays in the delivery of tasks with the aim of reducing them. It’s a small and diverse team in an information technology services company that works from ...
LED Luminaire Replacement in Puerto Rico Electric Power Authority San Juan Steam Plant
(Polytechnic University of Puerto Rico, 2020)
With the objective of finding the best economical alternative to High-Pressure Sodium exterior luminaires, this paper looked to determine if Light-Emitting Diode lights could provide a lower cost replacement. The analysis ...
Coating Process Minor Changeover Reduction
(Polytechnic University of Puerto Rico, 2020)
During the Covid-19 Pandemic, many challenges arose that force healthcare companies to execute in new ways. Product demand was increased due to its effectiveness against the pandemic impact in the patients. To provide a ...