The Impact of Employee Absenteeism in Fast-Tracks Projects
(Polytechnic University of Puerto Rico, 2021)
Fast-tracking is a project management technique where activities are performed simultaneously, instead of waiting for each task to be completed separately. When personnel do not show for work, it creates a negative impact. ...
OneDay Toric Yield Improvement
(Polytechnic University of Puerto Rico, 2021)
This project was developed in CooperVision, Juana Diaz Site, specifically for the OneDay Toric product. It is focused on the Wet
Process of the product life cycle. There was a gap between two manufacturing technologies ...
Missing Magnet Defect Rate Improvement Project at the Cement Unit at Stryker Puerto Rico
(Polytechnic University of Puerto Rico, 2023)
At Stryker Puerto Rico, there was a growing of customer complaints for the new Prep+ Cartridge. The complaints were generated due to units found without a component. This is a magnet that is placed on the back of the product ...
Rediseño para optimizar manejo de cuentas delincuentes
(Polytechnic University of Puerto Rico, 2022)
Debido a una falta de revisión y actualización de procesos, el Banco XYZ estaba experimentando problemas en el proceso de
recobro. Pare este proyecto se logró plasmar un rediseño del flujo por el cual pasan las cuentas ...
Development Studies for the Surgicel SNoW Load Increase in the Dehumidification Chamber
(Polytechnic University of Puerto Rico, 2022)
A medical device company was facing a significant downtime related to “waiting for material”. Due to the high processing time and
small loads in the dehumidification process, the next operation (Sealing) was being impacted. ...
Improving efficiency on surgical device’s manufacturing process
(Polytechnic University of Puerto Rico, 2022)
A global medical device company is suffering a significant efficiency decrease in one of their most important manufacturing processes. The purpose of this project was to improve this line efficiency by a minimum of 10%. ...
Impacting an Organization by Reducing Cost of Spare Parts and Excess Inventory
(Polytechnic University of Puerto Rico, 2022)
Excess inventory and the cost of replacement parts are found to be an area of opportunity within a maintenance department for a
vessel terminal in San Juan, Puerto Rico. The quantitative model is the approach that was ...
Mejorar la productividad de un grupo de ingenieros en una oficina de gobierno
(Polytechnic University of Puerto Rico, 2022)
En una oficina de gobierno, la baja
productividad de los ingenieros es un problema que
ha afectado la compañía por los pasados dos años.
Para determinar la causa del problema, se realizó
un cuestionario a trece ...
Achieving High Performance Level for Remote Working
(Polytechnic University of Puerto Rico, 2022)
After the COVID-19 pandemic many employees were forced to work from home. Most of these employees were showing low performance when working remotely. The low performance was associated with the different distracting factors ...
Implementación de Línea de Fabricación de Lentes Intraoculares
(Polytechnic University of Puerto Rico, 2022)
El aumento en la demanda de lentes intraoculares ha causado la necesidad de implementar una nueva línea de fabricación de
dicho producto en la fábrica FX en Yauco, Puerto Rico. Esto se hizo con el fin de brindarle apoyo ...