Buscar
Mostrando ítems 21-30 de 409
Waste Handling Optimization: Operation Cost and Environmental Impact Minimization
(Polytechnic University of Puerto Rico, 2022)
The company Eli Lilly established environmental goals to reduce waste and manage resources more effectively. From this, the
pharmaceutical site in PR underwent a waste generation evaluation of its current operations, to ...
Firma Electrónica para Pacientes y Familiares
(Polytechnic University of Puerto Rico, 2022)
Este proyecto está enfocado en el área hospitalaria del área oeste de Puerto Rico. El propósito fue eliminar los documentos que
conlleven firma de pacientes o familiares con el fin de integrarlo al récord electrónico y ...
Reducción del número de errores en los planos de construcción y aumento del rendimiento de producción en términos de calidad
(Polytechnic University of Puerto Rico, 2021)
El alto volumen de trabajo combinado con la pobre comunicación entre los miembros del equipo, resulta en un aumento en la cantidad de errores no corregidos, disminuyendo la calidad de los planos de construcción de la firma ...
Reducing the Wing Body Join (In-Tank Systems) Cycle Time
(Polytechnic University of Puerto Rico, 2022)
Due to increased demand, The Boeing Company decided to reduce the cycle time of the 777/777x Airplane Program from 10-day to 7-day. This project impacts the position of the Wing Body Join (In-Tank Systems). The goal was ...
Reduction of Extensive Construction Costs & Lead Times of Single-Family Homes in Florida due to Covid-19
(Polytechnic University of Puerto Rico, 2022)
The timely completion of single-family homes in Florida was significantly affected by the outbreak of COVID-19 due to increased prices of materials, services, and lead time. Supply chain disruption and inefficient project ...
Improvement of acquisition strategies and employee satisfaction between multiple companies
(Polytechnic University of Puerto Rico, 2022)
In the United States, various mergers especially those with engineering applications, have been notoriously unsuccessful compared to other industries. The purpose of this project is to eradicate two of the most common ...
Improving Data Collection Processes for F-16 Test Units at Nellis Air Force Base Nevada
(Polytechnic University of Puerto Rico, 2021)
Test units of the F-16 fighter jet collect significant amounts of data. It is important that this data gets processed, analyzed, and archived properly. This project focused in improving data collection processes with ...
Investigation Process Improvement in a Pharmaceutical Company
(Polytechnic University of Puerto Rico, 2022)
Manufacturing companies are subject to product incidents. These are managed by investigators to identify root causes, solutions and avoid reoccurrence. Investigation completion within time ensures that product will reach ...
Increasing drivers’ performance in container delivery to reduce labor cost
(Polytechnic University of Puerto Rico, 2022)
Waste Management Company (WM) in South Florida has a South Florida Container Shop site where drivers are dedicated to the delivery and collection of containers or equipment necessary for garbage collection or recycling, ...
Configuration of Manufacturing Line using Cell Operating System on a Patch and Serter Installation System
(Polytechnic University of Puerto Rico, 2021)
The objective of this project was to implement a new product to the manufacturing assembly line at medical devices company. The product is categorized at a high inventory level. The manufacturing line was moving from a ...