Buscar
Mostrando ítems 331-340 de 400
Continuous Navy Ships Process Improvement: Six Sigma, Lean Thinking, and Theory of Constraints
(Polytechnic University of Puerto Rico, 2020)
Long waiting time in the equipment repair process in Norfolk Naval Shipyard is an actual problem. The main cause of this problem is the poor knowledge of the continuous process improvement techniques as Six Sigma, Lean ...
Optimización de los Procesos de Calidad en “Rainbow Research Optics”
(Polytechnic University of Puerto Rico, 2020)
Este proyecto se realizó en la compañía “Rainbow Research Optics” y surgió debido a la gran cantidad de piezas devueltas por
los clientes en los meses de diciembre 2019 a febrero 2020. Luego de estudiar el problema se ...
Improving Employee Retention at Pratt & Whitney Puerto Rico
(Polytechnic University of Puerto Rico, 2020)
When a company has a major change in scope and culture, the tendency is to grow and adapt. The company in question, Pratt & Whitney, experienced growth but the adaptation has become problematic. Their growth has caused ...
International Trade Compliance Response Time
(Polytechnic University of Puerto Rico, 2021)
The objective of this project was to increase the overall performance of the International Trade Compliance (ITC) department
in Collins Aerospace and to reduce the average time it takes to close a classification request. ...
Optimización de tareas para personal de apoyo técnico en el área de manufactura parenteral en Janssen Gurabo
(Polytechnic University of Puerto Rico, 2021)
El servicio de apoyo técnico es brindado al área de manufactura parenteral en Janssen Gurabo. Dentro de las situaciones
observada, se encuentran las siguientes: tiempos de respuesta alto, pobre documentación y mala ...
WECI Inventory Reduction and Just-In-Time Implementation
(Polytechnic University of Puerto Rico, 2020)
The organization studied showed substantially high levels of inventory, thus a reduction was in need. Given the little information
available to implement this in a service environment, a new approach was needed. A mix ...
Second Row 60% Seat Cushion Optimization
(Polytechnic University of Puerto Rico, 2020)
This paper discusses changes in a seat mechanism design to address an issue found as part of automotive validation. For an automotive manufacturer, prototype vehicles were found to have insufficient retention of the second ...
Industrial Plant Equipment Maintenance Strategy
(Polytechnic University of Puerto Rico, 2020)
At Robins Air Force Base, specifically in the engineering equipment maintenance department, a problem has been identified in the management of labor. Equipment / machineries used in the production area suffer from high ...
Ultrasonic Welding Process Improvement for the Scrap Reduction of a Medical Device
(Polytechnic University of Puerto Rico, 2020)
A medical device company in Puerto Rico aims to improve an Ultrasonic Welding Process of a high-volume bone shredding medical device. The current process yield is 93% and must be at least 95% to meet the manufacturing site ...
Improvement of the Daily Manufacturing Operations Productivity of the Injection Molding Department by at Least 5%
(Polytechnic University of Puerto Rico, 2020)
Productivity is the most significant factor in manufacturing industries. Low productivity of workers can have a great impact in the finances of an organization. In this project paper, the focus is to improve the manufacturing ...