Buscar
Mostrando ítems 621-630 de 862
Plan de mejora para la identificación, adquisición, almacenamiento y control de las piezas de repuesto utilizadas en los equipos de producción y planta física
(Polytechnic University of Puerto Rico, 2013)
La necesidad de implementar un sistema robusto de piezas de repuesto es fundamental para la compañía, ya que el tiempo de
parada por falta de piezas de repuesto es muy costoso. Por tal razón se trabajó con urgencia un ...
US Army Distributed Simulation Capabilities
(Polytechnic University of Puerto Rico, 2013)
Budget reduction, debt ceiling, Government costs have become a big problem to the United States government and politicians. This issue has arisen because of the possible debt ceiling reaching its limit and the economy not ...
Zero Waiting Time at the Emergency Room
(Polytechnic University of Puerto Rico, 2013)
Long waiting times at the Emergency Rooms are a problem that affects every hospital in Puerto Rico. The main causes of this problem are the lack of patients understanding the purpose of the ER and the inefficient use of ...
Automation of Guidewire Packaging Lines at ABBOTT Laboratories Vascular Division
(Polytechnic University of Puerto Rico, 2013)
With the increasing demand for guidewires worldwide, Abbott decided to make changes in the manufacturing line in order to meet
these demands. In an evaluation of the manufacturing process, they considered that the area ...
Improve Major Changeover Procedure in MK0431AR Coating Area
(Polytechnic University of Puerto Rico, 2013)
Today, most plants are running multiple products per line per day, including varieties of the same products, requiring many changeovers with the intense pressures to boost production efficiency, meet increasing consumer ...
Toxoplasma IgG Quality Control Testing Optimization
(Polytechnic University of Puerto Rico, 2013)
This project explores a lean initiative of a multinational healthcare company related to a Toxoplasma IgG (protozoan parasite) quality control test. The objective was to reduce the test’s cycletime, material consumption ...
Value-Based Care: The Next Stage of Medical Finance
(Polytechnic University of Puerto Rico, 2023)
The healthcare system in the USA has expanded the use of an alternative to its traditional fee-for-service programs. This paper is built on the need one Bayamon Medical Office has to develop a transition plan to change ...
Stamping Tooling Preventive Maintenance Project
(Polytechnic University of Puerto Rico, 2023)
Eaton Corporation's Electrical Sector, a global leader in power management solutions, faces a critical challenge in the Stamping
Department's tooling equipment maintenance. The absence of a defined Preventive Maintenance ...
Vent to Roof Rainwater Occlusion and Management
(Polytechnic University of Puerto Rico, 2023)
Safety relief devices in a pharmaceutical manufacturing start-up were found to be occluded by rainwater. The number of times
these vent lines were found to be occluded varied greatly and depended on weather conditions ...
Improving Dilator’s Line Capacity, Inventory, and Management Control
(Polytechnic University of Puerto Rico, 2023)
This paper addresses operational challenges in Inari Medical's Dilator line, integral to Venous Thromboembolism (VTE) treatment
devices. The project focuses on inventory control, line capacity, and management control to ...