Buscar
Mostrando ítems 631-640 de 851
Productivity Increase on Manufacturing Line A
(Polytechnic University of Puerto Rico, 2022)
In company that shall remain anonymous, Manufacturing Line A was underperforming, often falling back in orders. Therefore, the company decided to put in place a project to look at increasing productivity in this high-mix ...
Improving micromanagement methods used in a software engineering organization
(Polytechnic University of Puerto Rico, 2022)
Management groups within businesses are constantly striving to implement new methods of tracking tasks. Micromanagement has become a popular method in modern times because of the level of detail that this method can manage. ...
Damaged cable solution on F-35 electric motor on Aerospace Industry
(Polytechnic University of Puerto Rico, 2022)
Broken wires on the electromagnetic motor of the F-35 aircraft is a problem that negatively impacts the production line. Each
broken wire defect is equivalent to a loss of $6,000. The major causes of these broken cables ...
Subcon Report Automation
(Polytechnic University of Puerto Rico, 2020)
This project consists of the automation of a report that is done manually on a daily basis at the Finance Department of an aerospace company in Aguadilla, Puerto Rico. By automating the report generation, it is expected ...
Optimization of the Induction Solutions Preparation and Addition Process in Bulk Manufacturing at a Biopharmaceutical Plant
(Polytechnic University of Puerto Rico, 2020)
An optimization of the induction solutions manufacturing and addition processes, used during the protein generation in a Cell
Culture process is pursued at a Biopharmaceutical plant located in Juncos, Puerto Rico. ...
Reduction and mitigation of foreign matter observed in product ABC
(Polytechnic University of Puerto Rico, 2020)
During the past three years, a manufacturing company for medical devices on the west side of Puerto Rico has been in the need of evaluating and mitigating the causes behind an increase in complaint incidents reported due ...
Implementación de sistema de control de inventario con RFID
(Polytechnic University of Puerto Rico, 2020)
En una compañía de implementación de sistemas y venta de equipos, como impresoras y dispositivos portátiles para logísticas entre otros, requiere como parte de su reestructuración contar con un sistema de control de ...
Medical Procedure Packs Missing Components Reduction
(Polytechnic University of Puerto Rico, 2020)
The project took place in a medical device company that manufactures custom procedure packs. During the pack assembly
process, components may be left out of the pack which causes the assembly process to stop to rework ...
Reduction in lead times of manufacturing Product X
(Polytechnic University of Puerto Rico, 2020)
The project takes place in an Aerospace Company in Puerto Rico. The purpose of it was to reduce the lead times of a specific
product called Product X, the product that will benefit the company the most. Qualitative ...
Solving a Problem of Delays in a Work Team
(Polytechnic University of Puerto Rico, 2020)
This project analyzes the work environment in a team that present delays in the delivery of tasks with the aim of reducing them. It’s a small and diverse team in an information technology services company that works from ...