Buscar
Mostrando ítems 81-90 de 380
Engineering and design application impact on sub-assembly line
(Polytechnic University of Puerto Rico, 2022)
A global company producer of medical devices and therapies was under process development of the sub-assembly line #2 for new product introduction and was having a long-time lead time for improved machine replicates drawings ...
SICD Manufacturing Scrap Yield Improvement
(Polytechnic University of Puerto Rico, 2021)
Defects that occur during the manufacture of a product are consider a problem that affects the yield rate of all manufacturing lines
around the world. The Subcutaneous Implantable Cardioverter Defibrillator (SICD) ...
Substation Transformer Replacement Plan
(Polytechnic University of Puerto Rico, 2021)
About half of the Gainesville Regional Utilities (GRU) substation transformers are above their industry usage limit standard of 45 years and are prone to catastrophic failure. This study critical health data was captured ...
Mejora de Proceso en Sumisión de Iniciativas de Innovación Tecnológica en una Organización Gubernamental Federal
(Polytechnic University of Puerto Rico, 2021)
En una agencia gubernamental federal existen varios foros de iniciativas de innovación los cuales promueven la creatividad dirigida hacia la resolución de problemas que beneficien a la misma. Para este proyecto se utilizó ...
Mejoras el proceso de almacenamiento de píldoras en Kalamazoo Pfizer, Michigan
(Polytechnic University of Puerto Rico, 2021)
La esencia de este proyecto era crear un mejor flujo dentro de la sala de almacenamiento de la farmacéutica de Kalamazoo. El objetivo principal fue desarrollar un diseño que redujera el tiempo de búsqueda de píldoras donde ...
Improvement of Manufacturing Line Fill Rate
(Polytechnic University of Puerto Rico, 2021)
Poor fill rates at manufacturing line for models 5038 and 4968 are problems that affected the cost metrics due to overtime and unsatisfaction of our patients around the world. The main cause of this problem is high lead ...
Scrap Reduction of Ventral Hernia Product in Foil Pouches for Manufacturing Line #7
(Polytechnic University of Puerto Rico, 2021)
Scrap generated in finished products is one of the top contributors that negatively impact the production goals and budget in most of the production industries. This paper shows a scrap reduction project conducted in a ...
Molding Scrap Reduction and Reutilization
(Polytechnic University of Puerto Rico, 2021)
A company named ABB, whose operations in Puerto Rico focuses on molded cable installation products, experienced scrap generation during the subassembly processes. The scrap costs represented over $200K per year. The Plant ...
Improvements in the Preventive Maintenance Program of an Automated Machine at a Manufacturing Line
(Polytechnic University of Puerto Rico, 2022)
During the preventive maintenance execution of an automated machine in a medical device company, it was identified by the operators that the procedures lack required tasks that shall be documented properly. Therefore, the ...
Maximizar la eficiencia de producción mediante automatización y digitalización en Honeywell Aeroespacial
(Polytechnic University of Puerto Rico, 2021)
Como parte de un esfuerzo de mejoras este proyecto fue seleccionado para maximizar la eficiencia de una línea de producción en Honeywell Aeroespacial a través de un análisis de tiempo de inactividad e implementando ...