Buscar
Mostrando ítems 81-90 de 344
Space Improvement in a Veterinary Pharmaceutical Warehouse
(Polytechnic University of Puerto Rico, 2012)
Abstract – This project design presents and analyze how a space problem was solved, inside a veterinary pharmaceutical warehouse, located in Panama City, Panama Republic. This veterinary pharmaceutical facility needs more ...
Applying International Organization Standardization Guideline for Quality System Management (ISO 9001:2008) in the Aerospace Industry
(Polytechnic University of Puerto Rico, 2012)
Abstract - The aerospace industry is based on the continuous improvement on processes and product within a high quality. Many companies are working with outsourcing companies to design most of the components that will be ...
Manufacturing Traceability System Replacement to Maintain Business Continuity in a Medical Device Company
(Polytechnic University of Puerto Rico, 2012)
Abstract - This project was focused in the Manufacturing Traceability System Replacement in a Medical Device Company. The existing Manufacturing Traceability System is obsoleted, therefore, a new Traceability system is ...
Hair Salon Process Improvement: A Lean Six Sigma Application to Service Industry
(Polytechnic University of Puerto Rico, 2012)
Abstract - In this project the waiting elapsed time of a customer will be analyzed and standardized to reduce or eliminate this time. The main objective of this project is to keep customer waiting time within 0 to 15 ...
Increasing Capacity by Designing a New Drying Process at a Manufacturing Plant
(Polytechnic University of Puerto Rico, 2012)
Abstract ⎯ High oil price is one of the major factors for this twenty-first century global economic recession. Inevitably everyone’s mindset has changed towards energy and the focus is towards finding renewable energy that ...
Design and Implementation of an Automated Assembly Line for a Manufacturing Facility
(Polytechnic University of Puerto Rico, 2012)
Abstract - As the field of automation has become more widespread, more companies, still mostly using manual labor, are looking into it to increase their productivity. However the transition between manual operation and ...
Improvement of a Public Utility Authority Complaint Responding System
(Polytechnic University of Puerto Rico, 2012)
Abstract - This project will be conducted in the Operations Department of a Public Utility Authority. The project will focus on the improvement of the agency complaints respond service. The Six Sigma DMAIC model was used ...
Improve Material Flow at Supplier
(Polytechnic University of Puerto Rico, 2012)
Abstract ⎯ This project will be focused in reducing the high lead time that characterizes one of the suppliers in a Medical Device Organization. By reducing the lead time of this supplier, the organization expects to have ...
HVAC Improvement for a Granulation Room of a Solid Dosage Manufacturer
(Polytechnic University of Puerto Rico, 2016)
A pharmaceutical facility located in
Vega Baja, Puerto Rico is dedicated to the
manufacturing and packaging of prescription and
consumer products that include tablets, caplets,
capsules and powder for oral suspensions. ...
HPKO Tank Replacement
(Polytechnic University of Puerto Rico, 2016)
The HPKO (Hydrogenated Palm Kernel
Oil) is utilized for the manufacturing of Product X at
Alsina Inc. Oil raw material was originally stored in
a tank made of carbon steel which is located in the
company’s premises. ...