Buscar
Mostrando ítems 131-140 de 199
Stamping Tooling Preventive Maintenance Project
(Polytechnic University of Puerto Rico, 2023)
Eaton Corporation's Electrical Sector, a global leader in power management solutions, faces a critical challenge in the Stamping
Department's tooling equipment maintenance. The absence of a defined Preventive Maintenance ...
Vent to Roof Rainwater Occlusion and Management
(Polytechnic University of Puerto Rico, 2023)
Safety relief devices in a pharmaceutical manufacturing start-up were found to be occluded by rainwater. The number of times
these vent lines were found to be occluded varied greatly and depended on weather conditions ...
Improving Dilator’s Line Capacity, Inventory, and Management Control
(Polytechnic University of Puerto Rico, 2023)
This paper addresses operational challenges in Inari Medical's Dilator line, integral to Venous Thromboembolism (VTE) treatment
devices. The project focuses on inventory control, line capacity, and management control to ...
International Trade Compliance Response Time
(Polytechnic University of Puerto Rico, 2021)
The objective of this project was to increase the overall performance of the International Trade Compliance (ITC) department
in Collins Aerospace and to reduce the average time it takes to close a classification request. ...
Optimization of Current Anodizing Line in Small Contract Manufacturing Company
(Polytechnic University of Puerto Rico, 2023)
Titanium Color Anodizing is a process that consists in creating an oxide layer in the titanium surface to change the color of titanium components. As a highly used process in the medical implant industry, a small contract ...
Digitalization and Standardization of Project Minutes
(Polytechnic University of Puerto Rico, 2023)
Fragmented processes for capturing infrastructure project meeting minutes have inhibited transparency, productivity, and
information access across Puerto Rico's municipalities. A newly implemented initiative systematically ...
Improving Supervision and Feedback in the Maintenance Department of ABC Food Manufacturing Plant
(Polytechnic University of Puerto Rico, 2023)
The ABC Food Manufacturing Plant has not trained its maintenance personnel in the implementation of new techniques for better key performance indicators. After a DMAIC analysis was performed on how to improve the supervision ...
Optimización de tareas para personal de apoyo técnico en el área de manufactura parenteral en Janssen Gurabo
(Polytechnic University of Puerto Rico, 2021)
El servicio de apoyo técnico es brindado al área de manufactura parenteral en Janssen Gurabo. Dentro de las situaciones
observada, se encuentran las siguientes: tiempos de respuesta alto, pobre documentación y mala ...
WECI Inventory Reduction and Just-In-Time Implementation
(Polytechnic University of Puerto Rico, 2020)
The organization studied showed substantially high levels of inventory, thus a reduction was in need. Given the little information
available to implement this in a service environment, a new approach was needed. A mix ...
Second Row 60% Seat Cushion Optimization
(Polytechnic University of Puerto Rico, 2020)
This paper discusses changes in a seat mechanism design to address an issue found as part of automotive validation. For an automotive manufacturer, prototype vehicles were found to have insufficient retention of the second ...