Buscar
Mostrando ítems 91-100 de 147
Applying Lean Manufacturing to Minimize Inspection Time in a Medical Device Company
(Polytechnic University of Puerto Rico, 2012)
Abstract - This research is conducted in medical devices manufacturing company that makes a product to be used on the treatment of female stress urinary incontinence resulting from urethral hyper mobility and intrinsic ...
Lean Tools in a Machine Shop Company
(Polytechnic University of Puerto Rico, 2012)
Abstract - A machine shop company has been identified due to lack organization in the workplace, deficiency by not labeling and storing used tools; workplace preventive maintenance, machines and workflow. The decision-making ...
Implementación de Lean Six Sigma en Procesos de Servicio del Área de Mantenimiento
(Polytechnic University of Puerto Rico, 2016)
El presente artículo describe una
propuesta de mejora en los procesos de servicio de
mantenimiento ofrecidos en el Residencial Luis
Muñoz Morales en Cayey. Analizado desde la
perspectiva de la reducción de ineficiencias ...
Surgical Technologies Clean Room Lines Capacity Improvement
(Polytechnic University of Puerto Rico, 2015)
In today’s competitive market, medical
device manufacturing companies need to
continuously innovate their products and process in
order to maintain a leader position on the medical
devices industry. Quality and Cost ...
Parenterals Vial Manufacturing Filling Area Yield Improvement Project
(Polytechnic University of Puerto Rico, 2015)
In the Parenterals Pharmaceutical
industry a quality, financial and manufacturing
measure of how the process is being operated and
that measures the appropriate use of materials,
excipients, and active product ingredients ...
Implementation of a 5S Project to Improve Office Layout and Functionality in a Small Consulting Firm
(Polytechnic University of Puerto Rico, 2015)
Planning is key to improve and
maintain daily operations on an office environment,
making it a challenge sometimes for small
companies to accustom to this. Lack of organization
and planning leads to poor usage of time, ...
Implementation of Lean Six Sigma in a Manufacturing Cell of Orthopedic Devices to Reduce Waste
(Polytechnic University of Puerto Rico, 2012)
Abstract - Lean practices with Six Sigma methodology has been successfully applied in many industries to ensure the reduction of wastes and improve product quality. In this case study, the proposed implementation of lean ...
Design and Implementation of an Automated Assembly Line for a Manufacturing Facility
(Polytechnic University of Puerto Rico, 2012)
Abstract - As the field of automation has become more widespread, more companies, still mostly using manual labor, are looking into it to increase their productivity. However the transition between manual operation and ...
Improve Material Flow at Supplier
(Polytechnic University of Puerto Rico, 2012)
Abstract ⎯ This project will be focused in reducing the high lead time that characterizes one of the suppliers in a Medical Device Organization. By reducing the lead time of this supplier, the organization expects to have ...
Implementación de un Sistema Lean de Digitalización de Reportes en una Facilidad Universitaria
(Polytechnic University of Puerto Rico, 2016)
Se utiliza metodologías de Lean para
evitar el gasto excesivo de papeles, utilizados en la
impresión de los informes creados en la oficina de
Sistemas de Información. Este método conlleva que
las peticiones de los ...