Suche
Anzeige der Dokumente 391-400 von 495
Manejo de la Productividad de los Empleados Utilizando Evaluación de 360o
(Polytechnic University of Puerto Rico, 2020)
Este proyecto se enfoca en la investigación del manejo de la productividad de los empleados utilizando el método de evaluación de 360 grados. El mismo tuvo una duración aproximada de dos meses, realizada a empleados de ...
Diagnóstico del Estado Actual del Proceso de Elaboración y Empaque del Producto Enlatado y Análisis de su Problemática de Sobrepeso Usando Seis Sigma
(Polytechnic University of Puerto Rico, 2020)
Se estudia el proceso de fabricación y empaque del producto enlatado de Industrias La Coruña debido a que se obtiene un producto con un peso mayor al declarado en la etiqueta causado por la variabilidad en los subprocesos, ...
Continuous Navy Ships Process Improvement: Six Sigma, Lean Thinking, and Theory of Constraints
(Polytechnic University of Puerto Rico, 2020)
Long waiting time in the equipment repair process in Norfolk Naval Shipyard is an actual problem. The main cause of this problem is the poor knowledge of the continuous process improvement techniques as Six Sigma, Lean ...
Optimización de los Procesos de Calidad en “Rainbow Research Optics”
(Polytechnic University of Puerto Rico, 2020)
Este proyecto se realizó en la compañía “Rainbow Research Optics” y surgió debido a la gran cantidad de piezas devueltas por
los clientes en los meses de diciembre 2019 a febrero 2020. Luego de estudiar el problema se ...
Improving Employee Retention at Pratt & Whitney Puerto Rico
(Polytechnic University of Puerto Rico, 2020)
When a company has a major change in scope and culture, the tendency is to grow and adapt. The company in question, Pratt & Whitney, experienced growth but the adaptation has become problematic. Their growth has caused ...
Value-Based Care: The Next Stage of Medical Finance
(Polytechnic University of Puerto Rico, 2023)
The healthcare system in the USA has expanded the use of an alternative to its traditional fee-for-service programs. This paper is built on the need one Bayamon Medical Office has to develop a transition plan to change ...
Stamping Tooling Preventive Maintenance Project
(Polytechnic University of Puerto Rico, 2023)
Eaton Corporation's Electrical Sector, a global leader in power management solutions, faces a critical challenge in the Stamping
Department's tooling equipment maintenance. The absence of a defined Preventive Maintenance ...
Vent to Roof Rainwater Occlusion and Management
(Polytechnic University of Puerto Rico, 2023)
Safety relief devices in a pharmaceutical manufacturing start-up were found to be occluded by rainwater. The number of times
these vent lines were found to be occluded varied greatly and depended on weather conditions ...
Improving Dilator’s Line Capacity, Inventory, and Management Control
(Polytechnic University of Puerto Rico, 2023)
This paper addresses operational challenges in Inari Medical's Dilator line, integral to Venous Thromboembolism (VTE) treatment
devices. The project focuses on inventory control, line capacity, and management control to ...
International Trade Compliance Response Time
(Polytechnic University of Puerto Rico, 2021)
The objective of this project was to increase the overall performance of the International Trade Compliance (ITC) department
in Collins Aerospace and to reduce the average time it takes to close a classification request. ...