Suche
Anzeige der Dokumente 191-200 von 230
Cogeneration with Energy Sustainability Project for Bacardi Distillery
(Polytechnic University of Puerto Rico, 2021)
At the Bacardi Distillery facilities in Puerto Rico, power outages are a problem that have affected rum production operations and costs. It has been identified that the cause of this problem is that the facilities do not ...
Syringe Filling Line Changeover Time Reduction by CIP Recipe Overlap with Product Transfer Recipe
(Polytechnic University of Puerto Rico, 2021)
In a biopharmaceutical company, the syringe filling process is thru one of two filtration trains that must be previously washed with a cleaning in place and sterilized with sterilization in place. Therefore, while one train ...
Freight Cost Reduction Project
(Polytechnic University of Puerto Rico, 2022)
Shipping products from the Caribbean have a limited amount of freight options in comparison with other geographical regions. For
HPE Puerto Rico, one of the main business goals for FY23 is to establish initiatives that ...
Medtronic Manufacturing Increase Capacity
(Polytechnic University of Puerto Rico, 2021)
Medtronic is a Fortune 500 company that dedicates in designing and manufacturing of medical devices. The company created an insulin pump that serves the function of an artificial pancreas. To develop a duplicate of the ...
Desarrollo de Nueva Línea de Ensamblaje de Producto X
(Polytechnic University of Puerto Rico, 2023)
El objetivo de este proyecto fue desarrollar una nueva línea de ensamblaje y establecer procedimientos operativos estándar para
el Producto X en una empresa especializada en dispositivos médicos estériles. Se analizó el ...
Optimización y automatización de reporte de despacho en el área de almacén
(Polytechnic University of Puerto Rico, 2023)
En el área de almacén de Hewlett Packard Enterprise, antes de despachar productos a producción, se llena un reporte de despacho que es utilizado como documento oficial de cada orden que se ha generado para ser enviado a ...
LED Streetlight Replacement Program for the San Juan Municipality
(Polytechnic University of Puerto Rico, 2023)
This project focuses on addressing the consequences of past storms, specifically Hurricane Maria in 2017 and Hurricane Fiona in 2022, on the street lighting system of the municipality of San Juan, Puerto Rico. The project's ...
Improvements to the Preventive Maintenance Process Performance at a Pharmaceutical Company
(Polytechnic University of Puerto Rico, 2023)
An analysis of the current performance
of the Preventive Maintenance (PM) process was
conducted for the four main areas of a
pharmaceutical company: Manufacture, Utilities,
Laboratory, and Facilities. The current ...
Understanding and Improving Engineering Change Proposal Development Efficiency in Raytheon’s Logistics Management Information - U.S. PATRIOT Database
(Polytechnic University of Puerto Rico, 2023)
This project aimed to raise efficiency for development and implantation per Class II ECP (Engineering Change Proposal). The task involved assessing the ECP development process and the intersectionality between inefficiency ...
Implementation of Component Relife Process for EEE Parts to Manage Obsolescence in Aerospace Company AEX
(Polytechnic University of Puerto Rico, 2023)
The aerospace industry is a subsector of the defense industry that is fast growing and constantly evolving. One of the challenges faced in this industry is the obsolescence of electrical, electronic, and electromechanical ...