Buscar
Mostrando ítems 171-180 de 230
Process Improvement of Equipment Support Project Requests
(Polytechnic University of Puerto Rico, 2020)
A project request package moves through five different departments: Pre-Induction, Engineering Design, Planning, Material and
Execution. The project request package is constantly returned to a previous department for ...
Reduction and mitigation of foreign matter observed in product ABC
(Polytechnic University of Puerto Rico, 2020)
During the past three years, a manufacturing company for medical devices on the west side of Puerto Rico has been in the need of evaluating and mitigating the causes behind an increase in complaint incidents reported due ...
Incrementar la capacidad de producción manufacturera en el interruptor residencial auto Q una pulgada
(Polytechnic University of Puerto Rico, 2020)
Recientemente la compañía ABB adquirió la división de GE Industrial Solution con la misión de ganar una mayor participación en el mercado de las Américas. A inicios del tercer trimestre del año 2020 el volumen de producción ...
Supplier Request (SR) Process Streamline and Optimization
(Polytechnic University of Puerto Rico, 2020)
The Supplier Request (SR) process is used by the supply base to electronically submit Process or Engineering change requests against the contractual relationship or approved technical baseline. The process is not optimized ...
Reducción de Costos de Piezas de Repuesto y Maximización del Taller Mecánico
(Polytechnic University of Puerto Rico, 2020)
El encargado de la supervisión del área de Mantenimiento, Almacén de piezas de Repuesto y Taller Mecánico de una industria de
instrumentos médicos tiene el presupuesto limitado para la operación del departamento. El ...
Data Center Monitoring System Upgrade
(Polytechnic University of Puerto Rico, 2020)
The project was developed at the Headquarters of the Defense Commissary Agency (DeCA), located at Fort Lee, Virginia, that
operates nearly 240 commissaries worldwide. The Agency’s data center was experiencing a high ...
Obsolescence Management- Unknown Parts
(Polytechnic University of Puerto Rico, 2020)
In an aerospace program, an opportunity to improve the obsolescence process was identified. The DMAIC methodology was
implemented. The Bill of Materials was evaluated and it was found that there are parts with Unknown ...
Streamlining Multi-Departmental Coordination for Timely Healthcare Facility Launch
(Polytechnic University of Puerto Rico, 2023)
This paper addresses the formidable challenge of establishing a new primary care facility in response to the healthcare needs of a 5,000- member community in Florida within a stringent one-year timeframe. The synchronization ...
Employee Guide to Cybersecurity and Cyber Threats
(Polytechnic University of Puerto Rico, 2023)
Cybersecurity is a growing concern for companies and workers due to the growing threats posed by technology. The Covid-19 pandemic has highlighted the need for protective shields, with malware being a major threat. WannaCry, ...
Optimización de la Documentación en Manufactura para Agilizar la Reconciliación y Disposición de Lotes
(Polytechnic University of Puerto Rico, 2023)
Para las industrias farmacéuticas asegurar la calidad es muy importante y más cuando agencias regulatorias establecen estándares estrictos de cumplimientos. Es común que la industria farmacéutica busque mejorar sus procesos ...