Improving Change Management of Supplier Changes While Mitigating Supply Chain Risk and Impact on Manufacturing Line
(Polytechnic University of Puerto Rico, 2022)
Unattended Supplier Change Requests represent a problem for Company XY. The lack of action toward Supplier Changes Requests results in a build-up of open changes that may impact the company's supply chain and manufacturing ...
Reforma de Tareas para Instalaciones Comerciales con Empleados Rotativos
(Polytechnic University of Puerto Rico, 2022)
Este proyecto piloto expone los problemas de una instalación comercial sin estructuración operacional. Juncos Plaza, nombre
que lleva de pila la instalación, ubicada en mencionado municipio terminada su construcción a ...
Reducción de Desperdicios Mediante la Eliminación de Filtros en el Área de Pipetas de la Compañía XY
(Polytechnic University of Puerto Rico, 2022)
El equipo de calidad de la compañía XY cada día se enfrenta a diferentes tipos de defectos que detienen la producción y crean
desperdicios para la compañía. Actualmente, la compañía se encuentra modificando el estándar ...
California Based Winery Respiratory Protection Program Cost and Time Reduction Study
(Polytechnic University of Puerto Rico, 2022)
Cost of compliance can be a hidden cost for a firm. This study evaluated a California based winery time and cost of Respiratory Protection Program compliance activities. Time and cost savings were found by digitalization ...
Optimización del proceso constructivo de la primera etapa de una obra de restauración de hormigón
(Polytechnic University of Puerto Rico, 2022)
En este artículo se identifican y analizan las variables que influyen en un proyecto de restauración de concreto localizado en la ciudad de Coral Gables, cuyo objetivo es optimizar el rendimiento de obra. La metodología ...
Time Management Improvement for Computerized Systems Validations’ Periodic Review Program
(Polytechnic University of Puerto Rico, 2022)
In the Information Technology Department of Bristol Myers Squibb Manatí Site, the development of a Periodic Review Program was developed for the execution of the Periodic Review Reports for Computerized Systems. The periodic ...
Chilled Water Plant Energy Upgrade
(Polytechnic University of Puerto Rico, 2022)
This project was undertaken to increase the efficiency of the cooling equipment at the Nakamura Courthouse in Seattle, WA which is a building that is managed by the General Services Administration (GSA), the government ...
Engineering and design application impact on sub-assembly line
(Polytechnic University of Puerto Rico, 2022)
A global company producer of medical devices and therapies was under process development of the sub-assembly line #2 for new product introduction and was having a long-time lead time for improved machine replicates drawings ...
SICD Manufacturing Scrap Yield Improvement
(Polytechnic University of Puerto Rico, 2021)
Defects that occur during the manufacture of a product are consider a problem that affects the yield rate of all manufacturing lines
around the world. The Subcutaneous Implantable Cardioverter Defibrillator (SICD) ...
Substation Transformer Replacement Plan
(Polytechnic University of Puerto Rico, 2021)
About half of the Gainesville Regional Utilities (GRU) substation transformers are above their industry usage limit standard of 45 years and are prone to catastrophic failure. This study critical health data was captured ...