Buscar
Mostrando ítems 1-10 de 16
Continuous Improvement in a Warehouse of Short Bark Industries
(Polytechnic University of Puerto Rico, 2013)
In the company Short Bark Industries
is manufacturing military clothing and accessories.
This company has a problem in the organization
and excess inventory in the warehouse. For this
they need to implement two Lean ...
Application of Lean Six Sigma Methodology to Optimize Fixation Device Assembly Line in the Medical Devices Industry
(Polytechnic University of Puerto Rico, 2013)
The research project was focused in the
line optimization of a Fixation Device assembly line
in a Medical Devices Industry. The Fixation Device
is called ProTack™. The Covidien Company is the
manufacturer located in ...
Coating Process Improvements in Solid Dose Form Manufacturing
(Polytechnic University of Puerto Rico, 2013)
Organization’s goals and objectives
use strategic scorecards that include Quality,
Economics, Speed and Culture to establish business
metrics focused on building continuous future
success and competitiveness to create ...
Implementation of a 5’S Pilot Program in the Veteran Administration Hospital in San Juan, Puerto Rico
(Polytechnic University of Puerto Rico, 2013)
In the recent years, the restructuring of
health system has taken an approach to quality
control in order to reduce cost and provide better
services to patient. However it is a process that
requires much work and ...
Optimization of the Qualification Process to Improve Products and Services in a Telecommunication Industry
(Polytechnic University of Puerto Rico, 2013)
This design was based on
standardizing the qualification process, reduce the
time to increase production and improve the
process of updating the information on the server.
The Kaizen event helped to solve different ...
Reducción en el Tiempo de un Proceso de Esterilización en un Tanque para la Manufactura de un Producto Biológico
(Polytechnic University of Puerto Rico, 2013)
Con el propósito de reducir costos en
producción asociados a tiempos de espera, con este
trabajo evaluaremos el proceso de esterilización de
un tanque fijo. Se revisará si es posible reducir el
tiempo de exposición de ...
Continuous Improvement in the Retention and Employment Placement – Link Between Both Processes
(Polytechnic University of Puerto Rico, 2013)
For the last decade, the socialeconomic factors as violence, underground
economy, the poverty level of living, high
unemployment, generations depending on subsidies
fund from the United States, has negatively
impacted ...
The Increase of Machine Utilization, using SMED, a Lean Manufacturing Tool
(Polytechnic University of Puerto Rico, 2013)
In this project we will see the
application of SMED (Single Minute Exchange
Dye) a Lean Manufacturing tool in the Medical
Device Industry, and how it helps to reduce the
time of changeover in a machine. One of the
benefits ...
Manufactura Esbelta en los Servicios de Limpieza de Cuartos en la Industria Hotelera
(Polytechnic University of Puerto Rico, 2013)
La manufactura esbelta (lean
manufacturing) es una forma de gestión de
procesos que permite a las empresas adaptarse
fácilmente a las condiciones cambiantes del mundo
globalizado. Su aplicación es diferente en ...
Implementing a Compressed Air Leak Preventive and Repair Program
(Polytechnic University of Puerto Rico, 2013)
In recent years the energy cost in Puerto
Rico has been constantly increasing. The reasons
vary from more expensive fuel costs, new
environmental regulations requirements and
inefficiencies in the system. The major ...