Suche
Anzeige der Dokumente 1-4 von 4
Automation of Final Test Station in the Manufacturing Process of a Medical Device Facility
(Polytechnic University of Puerto Rico, 2013)
The IS-4 Final Test Station will
incorporate the entire test needed to assure that the
leads that are manufactured in Boston Scientific
are built with a high quality standard that will
assure the safety of the patient. ...
Increase Productivity in a Manufacturing Department of a Medical Devices Company
(Polytechnic University of Puerto Rico, 2013)
In all companies the productivity is a
very important metric because is the way to make
sure that we optimize our resources and time. Is the
way to measure if we are manufacturing as
expected and with the required ...
Diseño de un Sistema Automatizado de Lotes para una Fábrica de Productos de Consumo
(Polytechnic University of Puerto Rico, 2013)
Una fábrica de jugos tenía un área de
oportunidad relacionada a la falta de abasto a la
demanda debido a la poca capacidad de
manufacturar jugos a grandes escala. Este
proyecto tiene como objetivo reducir el tiempo ...
Stack and Bond Automation for Rotor and Stator Cores Manufacturing Application
(Polytechnic University of Puerto Rico, 2013)
The manufacturing process for the core
of the electric motors or electric generators starts
with the stacking process of core. The main
objective in this project is to reduce the
manufacturing time and improve the ...