Suche
Anzeige der Dokumente 1-10 von 21
Improve the Cycle Time of Stat Testing in Quality Control Laboratory Applying Kaizen Analysis
(Polytechnic University of Puerto Rico, 2013)
Quality Control Laboratory of
Biopharma Company was selected for develop a
design project, using the technique of Kaizen
Project. Manufacturing area of Biotech Company
produces a biological product. Biologic Bulk ...
Material Qualification Process Improvement to Reduce the Cycle Time
(Polytechnic University of Puerto Rico, 2019)
This project was focused in improving
the material qualification process, reducing the
cycle time. A Documentation Checklist and Tracking
Sheet System were created as part of the
improvements. The Documentation Checklist ...
Equipment Validation Standardization for Project Implementation Time Reduction of Automated Manufacturing Platforms
(Polytechnic University of Puerto Rico, 2012)
Abstract - Medical Device regulated industry requires extensive validation work. Using the latest automation technology for the process equipment to eliminate the operator interaction brings the challenge of how fast the ...
Suppliers Information Exchange Process Optimization
(Polytechnic University of Puerto Rico, 2018)
The emphasis of this research project
is to reduce the processing time for supplier’s
requests for change and/or information (RC/I), a
tool utilized to request information and/or change
in response to technical or ...
Changeover Reduction Time by Adjusting the Cleaning Critical Parameters in Automated CIP Systems
(Polytechnic University of Puerto Rico, 2018)
Clean-In-Place (CIP) is a widely use
process to clean biotechnology vessels contact
surfaces. CIP is an automated cleaning method that
involve minimum to no equipment disassembling
thereby reducing labor and time ...
Time Cycle Reduction of the Scrap Process in a Medical Device Company
(Polytechnic University of Puerto Rico, 2011)
As part of an assessment performed for continuous improvement it was identified that the Nonconformance (NC) Timeline metric shows 23% over the goal of 30 days closure. From the list of NC Reports (NCR) impacting this ...
Implementation of Lean Methodologies in the Small Radiology Firm Bayamón Radiology Center
(Polytechnic University of Puerto Rico, 2019)
The Lean methodology was used to
reduce examination cycle and lead times for the
radiology clinic Bayamon Radiology Center. They
clinic had a conventional X-ray system that uses
x-ray films. Voice of the Customer and ...
In-Process pharmaceutical manufacturing aqueous coating suspension hold time study
(Polytechnic University of Puerto Rico, 2018)
A hold time study is established in the
development phase of any product. All the InProcess unit operations require a hold time study to
protect the integrity and quality of the final drug
product. This study will analyze ...
Application of Lean Manufacturing and Lean Six Sigma Tools to Improve Back to Back Activities in the Compression Process
(Polytechnic University of Puerto Rico, 2019)
A recent opportunity regarding a
product ramp up in the production schedule due to
a potential product transfer requires the
manufacturing area to look for creative ways to
improve in order to comply with expected ...
On Boarding Cycle Time Improvement to Accelerate Recruitment of Store Operations
(Polytechnic University of Puerto Rico, 2015)
Recruitment is a crucial step in all of the
companies around the world. Is the process of
finding and hiring the best qualified candidate for a
job opening, in a timely and cost effective manner,
This process also ...