Buscar
Mostrando ítems 171-180 de 186
Automobile Cabin Water Leak Resolution
(Polytechnic University of Puerto Rico, 2019)
An automobile manufacturing company is concerned with the recurring number of claims for repairs on their vehicles. Customer satisfaction is down, because of water leaks inside their vehicles through the roof antenna hole. ...
Cross-Functional Teaming and Eradication of “Stove Piping” in Government Acquisition
(Polytechnic University of Puerto Rico, 2019)
Throughout the years, Government Acquisition has been affected by a situation called “Stove piping”, which restricts the flow of
information and channels it through vertical lines of control. This results in duplication ...
Mejoramiento del proceso de estudios de campo e instalaciones
(Polytechnic University of Puerto Rico, 2019)
El proyecto que se presenta a continuación se compone del mejoramiento del proceso de estudios de campo e instalaciones en una empresa de telecomunicaciones. Aquí se encontrará un desglose de todas las reuniones con diversos ...
Optimization of the Receiving Request Process for Jurisdiction and Classification
(Polytechnic University of Puerto Rico, 2019)
The purpose of the project is the centralization of jurisdiction and classification (JC) of commodities and technology in a single unit for the entire Pratt & Whitney organization, as well as to unify and standardize the ...
Idle Time Reduction in Formulation Room
(Polytechnic University of Puerto Rico, 2019)
The Amgen Manufacturing Limited formulation room was impacted by the increase of forecasted variable demand for 2019 and 2020. During the evaluation it was found that decreases in demand for certain months caused an increase ...
Orion’s Force Class Ship
(Polytechnic University of Puerto Rico, 2019)
The United States Navy (hereinafter referred to as Navy) submitted a request for proposals (RFP) for a new class of surface ships
titled Force Class Ship. Orion Industries submitted a proposal for their design which they ...
United States Navy Force Projection Improvement Project
(Polytechnic University of Puerto Rico, 2019)
An increase presence of US Navy ships is required in the Pacific Theater to maintain stability in the region. The increase of operating time at sea for the ships increases the time required for maintenance and repairs ...
Optimización del manejo de “totes” en centro de distribución
(Polytechnic University of Puerto Rico, 2019)
La ineficiencia e ineficacia en los procesos dentro de los centros de distribución es un tema muy poco atendido y que impacta
negativamente el costo de operaciones en la gran mayoría de los centros. Las causas principales ...
Análisis de Sistema de energía renovable
(Polytechnic University of Puerto Rico, 2019)
Se aplicó la metodología DMAIC para analizar un sistema de energía renovable probando si se encontraba en su máxima-función. Como resultado del proyecto (se analizó el funcionamiento del sistema), se supo que sí era ...
Outsource Component for Quality Improvements
(Polytechnic University of Puerto Rico, 2019)
In a medical device facility located in Puerto Rico, the process used for the manufacturing of plastic tubes was to have an inhouse extrusion machine to produce tubing of several dimensions. These tubes then follow the ...