Suche
Anzeige der Dokumente 191-200 von 504
US Army Distributed Simulation Capabilities
(Polytechnic University of Puerto Rico, 2013)
Budget reduction, debt ceiling, Government costs have become a big problem to the United States government and politicians. This issue has arisen because of the possible debt ceiling reaching its limit and the economy not ...
Zero Waiting Time at the Emergency Room
(Polytechnic University of Puerto Rico, 2013)
Long waiting times at the Emergency Rooms are a problem that affects every hospital in Puerto Rico. The main causes of this problem are the lack of patients understanding the purpose of the ER and the inefficient use of ...
Automation of Guidewire Packaging Lines at ABBOTT Laboratories Vascular Division
(Polytechnic University of Puerto Rico, 2013)
With the increasing demand for guidewires worldwide, Abbott decided to make changes in the manufacturing line in order to meet
these demands. In an evaluation of the manufacturing process, they considered that the area ...
Improve Major Changeover Procedure in MK0431AR Coating Area
(Polytechnic University of Puerto Rico, 2013)
Today, most plants are running multiple products per line per day, including varieties of the same products, requiring many changeovers with the intense pressures to boost production efficiency, meet increasing consumer ...
Improving Medical Devices Manufacturing – From the Push system to the Pull system
(Polytechnic University of Puerto Rico, 2012)
A manufacturing subassembly line at medical devices company currently supplies two sites with manufacturing lines. The subassembly line has high inventory levels which reduce cash flows for potential investments. The high ...
Toxoplasma IgG Quality Control Testing Optimization
(Polytechnic University of Puerto Rico, 2013)
This project explores a lean initiative of a multinational healthcare company related to a Toxoplasma IgG (protozoan parasite) quality control test. The objective was to reduce the test’s cycletime, material consumption ...
El impacto en la logística de distribución de Federal Express ante el alza de combustible
(Polytechnic University of Puerto Rico, 2022)
Esta investigación consiste en estudiar el impacto que tiene el alza del combustible en la compañía Federal Express. De
conformidad con los estudios previamente realizados, se efectuó un análisis financiero considerando ...
Improving Change Management of Supplier Changes While Mitigating Supply Chain Risk and Impact on Manufacturing Line
(Polytechnic University of Puerto Rico, 2022)
Unattended Supplier Change Requests represent a problem for Company XY. The lack of action toward Supplier Changes Requests results in a build-up of open changes that may impact the company's supply chain and manufacturing ...
Reforma de Tareas para Instalaciones Comerciales con Empleados Rotativos
(Polytechnic University of Puerto Rico, 2022)
Este proyecto piloto expone los problemas de una instalación comercial sin estructuración operacional. Juncos Plaza, nombre
que lleva de pila la instalación, ubicada en mencionado municipio terminada su construcción a ...
Reducción de Desperdicios Mediante la Eliminación de Filtros en el Área de Pipetas de la Compañía XY
(Polytechnic University of Puerto Rico, 2022)
El equipo de calidad de la compañía XY cada día se enfrenta a diferentes tipos de defectos que detienen la producción y crean
desperdicios para la compañía. Actualmente, la compañía se encuentra modificando el estándar ...