X Regrind Usage for TY27MX
(Polytechnic University of Puerto Rico, 2021)
TY27MX is a high-runner catalog from ABB Caribe. Since the first quarter of 2020, high levels of scrap were detected at the production line caused by process variation and inherent conditions. Resin X regrind usage was ...
Tracking Construction Documents Development Process in an Architecture & Engineering Firm
(Polytechnic University of Puerto Rico, 2021)
A local Architecture & Engineering firm needed to evaluate current option to track the Construction Documents Development Process. They wanted to know what new technologies or strategies are available to reduce production ...
Drug Product Process Development Storage Capacity at Amgen’s AML7x
(Polytechnic University of Puerto Rico, 2021)
The project aimed to increase the storage capacity for the drug product process development team in AM17x building at Amgen.
Storage process and operation improvements were identified through the use of the lean concept. ...
Reducción de ausentismo de empleados en un proyecto de construcción de vía rápida
(Polytechnic University of Puerto Rico, 2021)
Los proyectos de construcción de vía rápida son un modelo de contratación en el que el diseño del proyecto y la ejecución de la obra se realizan casi en forma paralela. A lo largo de dos meses, una empresa de construcción ...
Mejoras al Procesador de Tapones de la Línea de Viales
(Polytechnic University of Puerto Rico, 2021)
Se realizó un estudio en una farmacéutica en la cual el residuo creado por el exceso de tapones de goma que se caen al piso de
la maquina generaba pérdidas. Para reducir el residuo, se evaluaron varias alternativas, de ...
Desarrollo de un Sistema de Control de Inventario y Mantenimiento de Equipos
(Polytechnic University of Puerto Rico, 2021)
Como parte de la gestión de incorporar equipo dentro de unas nuevas instalaciones, se desarrolló un sistema de control
de inventario y mantenimiento dentro de un almacén de una agencia militar. Las cinco fases de la ...
Past Due Reduction on 37mm Syringe Filters Manufacturing Line
(Polytechnic University of Puerto Rico, 2021)
In Pall Life Sciences Puerto Rico, the past due on the 37mm manufacturing line was at $262,000 and continues increasing. The root cause for this issue is due to a mix of material shortage and customer demand increase. After ...
Mitigación de Erosión en Paseo Lineal en Puerta de Tierra
(Polytechnic University of Puerto Rico, 2021)
La situación actual en el Paseo Lineal de Puerta de Tierra requiere una acción inmediata para mitigar la erosión costera. Bajo el renglón de análisis, se evaluaron varias alternativas y en busca de efectividad tanto ...
Separación laboral: causa, efecto y consecuencias
(Polytechnic University of Puerto Rico, 2021)
Este proyecto busca las causas principales que incrementan las separaciones laborales dentro de grandes compañías como L3
Harris Technology. A través de evaluaciones, encuestas y entrevistas, se encontró la necesidad de ...
Electrical and Controls Maintenance Strategy
(Polytechnic University of Puerto Rico, 2021)
Keeping an automated manufacturing line in the pharmaceutical industry competitive through the end of life is challenging.
The total cost of ownership starts increasing with the amount of new problems that arise as ...