Buscar
Mostrando ítems 21-30 de 31
Improvement of a Public Utility Authority Complaint Responding System
(Polytechnic University of Puerto Rico, 2012)
Abstract - This project will be conducted in the Operations Department of a Public Utility Authority. The project will focus on the improvement of the agency complaints respond service. The Six Sigma DMAIC model was used ...
Engineering Standard Work Proficiency Reports Automation for the Aerospace Industry
(Polytechnic University of Puerto Rico, 2012)
Abstract - The study was conducted in an Aerospace Industry located in Isabela, Puerto Rico. The objectives of this project were to eliminate report errors and to reduce the report development from 5 days to less than 1 ...
Improve Material Flow at Supplier
(Polytechnic University of Puerto Rico, 2012)
Abstract ⎯ This project will be focused in reducing the high lead time that characterizes one of the suppliers in a Medical Device Organization. By reducing the lead time of this supplier, the organization expects to have ...
Increasing Capacity by Designing a New Drying Process at a Manufacturing Plant
(Polytechnic University of Puerto Rico, 2012)
Abstract ⎯ High oil price is one of the major factors for this twenty-first century global economic recession. Inevitably everyone’s mindset has changed towards energy and the focus is towards finding renewable energy that ...
Implementación de Herramientas que Aseguran la Calidad del Servicio en Centros de Contactos
(Polytechnic University of Puerto Rico, 2012)
Abstracto ⎯ Este proyecto envuelve la integración de herramientas de calidad en nuestro centro de contactos conocido como la Red Interactiva de Servicio (RIS). El objetivo es comprender la importancia de calidad y a su vez ...
Workmanship Error at Assembly Line in a Medical Device Company
(Polytechnic University of Puerto Rico, 2012)
Abstract — In a Medical Device Company a production line had an increase of non-conformances in 2011. The category for the increase was workmanship error. These failures result in cost of poor quality due to quality holds. ...
Guideline for the Development of a Capable Training Program for New Hire Employees in the Design Area of an Aerospace Industry in Puerto Rico
(Polytechnic University of Puerto Rico, 2012)
Abstract - The aerospace industry is very sophisticated since their products and services needs to be in compliance with the highest levels of quality. Since currently this type of industry is new in Puerto Rico most of ...
Implementation of a Calibration Wireless System in a Pharmaceutical Facility
(Polytechnic University of Puerto Rico, 2012)
Abstract - Regulated industries such as Pharmaceutical, Biotechnology and Medical Devices require a Calibration Program, to guarantee the product quality. The objective of this project was to design Calibration Wireless ...
A Strategically Systematic Approach to Acquire Improvement Project Prospects in a Medical Device Company
(Polytechnic University of Puerto Rico, 2012)
Abstract - Numerous companies begin their manufacturing improvement journey lacking an overall game plan. This results in a not strategized and structured improvement implementation with results less than optimal and if ...
Determination of In-Processing Manufacturing Impact into Elution Rate of Drug Eluting Steroid Collars
(Polytechnic University of Puerto Rico, 2012)
Abstract - The Food and Drug Administration provides regulations for combination products. The medical device industry needs to comply with these regulations specifically in products containing drug. One of the many ...