Buscar
Mostrando ítems 51-60 de 89
Implementation of a 5S Project to Improve Office Layout and Functionality in a Small Consulting Firm
(Polytechnic University of Puerto Rico, 2015)
Planning is key to improve and
maintain daily operations on an office environment,
making it a challenge sometimes for small
companies to accustom to this. Lack of organization
and planning leads to poor usage of time, ...
Implementation of Lean Six Sigma in a Manufacturing Cell of Orthopedic Devices to Reduce Waste
(Polytechnic University of Puerto Rico, 2012)
Abstract - Lean practices with Six Sigma methodology has been successfully applied in many industries to ensure the reduction of wastes and improve product quality. In this case study, the proposed implementation of lean ...
Design and Implementation of an Automated Assembly Line for a Manufacturing Facility
(Polytechnic University of Puerto Rico, 2012)
Abstract - As the field of automation has become more widespread, more companies, still mostly using manual labor, are looking into it to increase their productivity. However the transition between manual operation and ...
Improve Material Flow at Supplier
(Polytechnic University of Puerto Rico, 2012)
Abstract ⎯ This project will be focused in reducing the high lead time that characterizes one of the suppliers in a Medical Device Organization. By reducing the lead time of this supplier, the organization expects to have ...
Journey Towards 5S: Tools to Organize a Workspace
(Polytechnic University of Puerto Rico, 2016)
Being at the messy level, the only thing
that is thought of is to perform the task in hand
without giving importance of keeping an organized
area. Things just go in a spot, in fact, any spot will
do. Management decided ...
Building your Businesses Performance using Quality Key Points
(Polytechnic University of Puerto Rico, 2016)
The problem with todays and
yesterday’s businesses is the lack of innovative
ideas because everything was build and presented
at the same time and not in stages. Today all you
see is what is left of what was once ...
Quality Management Applied on a Food Industry
(Polytechnic University of Puerto Rico, 2011)
Abstract – The research project was focused in transforming the quality engineering perspective from one that solves problems directed to engineers to one that solves routine problems that affects the entire society. ...
Lean Six Sigma: Process Improvement at Hospital X’s Emergency Department
(Polytechnic University of Puerto Rico, 2017)
The opportunity to establish and
outcome some frequently used industrial and
process engineering tools in a 28-bed, hospital
emergency department (ED), located in Puerto
Rico, was presented to CIRACET Corp. With ...
Reduction of Time in a Manufacturing Process for a Pharmaceutical Company Located in Puerto Rico
(Polytechnic University of Puerto Rico, 2012)
Abstract - The project is developed in a chemical plant of a pharmaceutical company in Puerto Rico. In 2011 the company had an increase in market demand of the active ingredient of one product. To ensure the profit plan, ...
Workmanship Error at Assembly Line in a Medical Device Company
(Polytechnic University of Puerto Rico, 2012)
Abstract — In a Medical Device Company a production line had an increase of non-conformances in 2011. The category for the increase was workmanship error. These failures result in cost of poor quality due to quality holds. ...