Mejora en el Proceso de Limpieza en los Equipos de Manufactura
(Polytechnic University of Puerto Rico, 2022)
Durante estudios de tiempo en los procesos en una farmacéutica en Puerto Rico se identificó un tiempo prolongado en la ejecución de limpieza de la Compresora que es compartida con varios productos .Por esta razón ...
Lean Six Sigma Implementation in a Small Business Warehouse Inventory Management Redesign
(Polytechnic University of Puerto Rico, 2022)
This design project is based on the suggestion to implement Lean Six Sigma concepts, with proper inventory management, in a small business: a local grocery store. This business has served Puerto Rico ...
Implementación de Lean Six Sigma y las Buenas Prácticas de Almacenamiento en una Empresa Puertorriqueña
(Polytechnic University of Puerto Rico, 2022)
Las organizaciones de regulación y control han desarrollado normativas a nivel internacional que deben cumplirse en todos los establecimientos que lleven a cabo productos de uso humano. Es por esto, ...
Mejoras al Proceso de Empaque parala Jurisdicción de China
(Polytechnic University of Puerto Rico, 2022)
En los últimos dieciocho meses, el mundo ha confrontado retos con el suministro de materia prima. En esta empresa no es la excepción, además, la productividad redujo, los desperdicios aumentaron y el tiempo de ...
Monomer’s Residuals Test Elimination for Soft Acrylic Buttons at Polytechnic University of Puerto Rico
(Polytechnic University of Puerto Rico, 2022)
In the cataract surgery, the natural lens in the eye is replace with an Intraocular Lens. Five monomers (EA/EMA, TFEMA, EGDMA, UV Chr) are mixed to produce the soft acrylic lens. Residual monomer testing ...
Labeling and Packaging Process Improvement Using DMAIC Methodology
(Polytechnic University of Puerto Rico, 2022)
Medical Device Companies must ensure that each unit of product has unique identification and that it is labeled correctly. Labeling requirements include having the appropriate data on the label, not ...
Change Control Routed with Missing Information Delaying Approval and Implementation Date
(Polytechnic University of Puerto Rico, 2022)
The approval of manufacturing change control for MedDevice Inc., is currently acting lower than target(15 business days). Based on a 12-months data review, the lead time of approval of a change is approximately ...
New flow route for the delivery of the to be cleaned filling equipment for the lot-to-lot changeover optimization using the lean manufacturing methodology
(Polytechnic University of Puerto Rico, 2022)
Management demand to reduce downtime in manufacturing had increased in recent years. This led manufacturing to use the Lean Methodology and Six Sigma tools to optimize the process. Focused on process improvement and ...
Improve HTS and Schedule B Classification Process to Reduce the Turnaround Time in a Commodity Shipments Compliance Project
(Polytechnic University of Puerto Rico, 2022)
The HTS and Schedule B classification process adds two days to the turnaround time of the standard process of the Commodity Shipments Compliance team. Throughout 2021, 108 of 326 requests approvals, requiring HTS ...
Manufacturing Process Coordination through Visual Analytics Tools
(Polytechnic University of Puerto Rico, 2022)
This research project was focused on the identification of requirements and the design of a software application toolset, which facilitates and improve the coordination of pharmaceutical manufacturing production steps. The ...