Building the foundation for a Work Zone Program at EFLHD
(Polytechnic University of Puerto Rico, 2019)
This article summarizes the findings of a project with the goal to improve work zone practices at the Eastern Federal Lands Highway Division. A gap analysis was conducted reviewing current practices and procedures to ...
Riveter Machine Reconditioning for Output Capacity Increase
(Polytechnic University of Puerto Rico, 2019)
The ability to ramp up or down production in order to quickly respond to customers’ demand is a necessity in today’s
competitive lean manufacturing environments. Output capacity bottlenecks forces manufacturing plants ...
Manufacturing Lines Process Optimization: Tissue Cutter
(Polytechnic University of Puerto Rico, 2019)
A medical devices company manufactures small tissue cutters. In this process, two pieces must be welded, grinded and
straightened. The tissue cutter must be grinded because of imperfections formed in the metal welded. ...
Automobile Cabin Water Leak Resolution
(Polytechnic University of Puerto Rico, 2019)
An automobile manufacturing company is concerned with the recurring number of claims for repairs on their vehicles. Customer satisfaction is down, because of water leaks inside their vehicles through the roof antenna hole. ...
Optimizing the Preventive Maintenance of the Magnetron
(Polytechnic University of Puerto Rico, 2018)
Accuray Incorporated is having issues with the random failures of magnetrons in the field. The objectives of this investigation are to prevent downtime due to the failure of the magnetron and to utilize the computer system ...
Optimización del Proceso de Producción de Encalado Mediante la Implementación de Técnicas de Ingeniería Gerencial
(Polytechnic University of Puerto Rico, 2018)
La Iglesia San José, en el Viejo San Juan, es uno de los monumentos más antiguos en Puerto Rico. Durante los últimos años de su proceso de restauración, en la Iglesia San José se han definido procedimientos y especificaciones ...
Packaging Cold Chain Program Improvement
(Polytechnic University of Puerto Rico, 2018)
With the growing trend of biologic medicines coming to the market, a packaging engineering group needed to create an internal
cold chain process to meet market demand in this area of cold shipments; although there is a ...
Incoming Area Optimization for Servers Repair Site
(Polytechnic University of Puerto Rico, 2018)
Continuous flow is a key in organizations with production lines and more than one working shift. The organization chosen for this
project is a repair site for servers and server components seeking to optimize their ...
Computer System Validation Cycle Optimization
(Polytechnic University of Puerto Rico, 2018)
The concept of the project involves the optimization of a current Computer system validation cycle in an active project in the
biopharma industry. The root cause for the problem was the excessive amounts of deviations ...
Preventive Maintenance Work Order Optimization
(Polytechnic University of Puerto Rico, 2018)
In the bio-pharmaceutical industry, maintenance is required to ensure equipment functions properly. Maintenance can be defined as activities performed on an equipment to ensure it functions with-in specification and ...