Buscar
Mostrando ítems 21-30 de 396
The Impact of Employee Absenteeism in Fast-Tracks Projects
(Polytechnic University of Puerto Rico, 2021)
Fast-tracking is a project management technique where activities are performed simultaneously, instead of waiting for each task to be completed separately. When personnel do not show for work, it creates a negative impact. ...
OneDay Toric Yield Improvement
(Polytechnic University of Puerto Rico, 2021)
This project was developed in CooperVision, Juana Diaz Site, specifically for the OneDay Toric product. It is focused on the Wet
Process of the product life cycle. There was a gap between two manufacturing technologies ...
Process Improvement of Equipment Support Project Requests
(Polytechnic University of Puerto Rico, 2020)
A project request package moves through five different departments: Pre-Induction, Engineering Design, Planning, Material and
Execution. The project request package is constantly returned to a previous department for ...
Incrementar la capacidad de producción manufacturera en el interruptor residencial auto Q una pulgada
(Polytechnic University of Puerto Rico, 2020)
Recientemente la compañía ABB adquirió la división de GE Industrial Solution con la misión de ganar una mayor participación en el mercado de las Américas. A inicios del tercer trimestre del año 2020 el volumen de producción ...
Supplier Request (SR) Process Streamline and Optimization
(Polytechnic University of Puerto Rico, 2020)
The Supplier Request (SR) process is used by the supply base to electronically submit Process or Engineering change requests against the contractual relationship or approved technical baseline. The process is not optimized ...
Reducción de Costos de Piezas de Repuesto y Maximización del Taller Mecánico
(Polytechnic University of Puerto Rico, 2020)
El encargado de la supervisión del área de Mantenimiento, Almacén de piezas de Repuesto y Taller Mecánico de una industria de
instrumentos médicos tiene el presupuesto limitado para la operación del departamento. El ...
Surface Residual Process Improvement
(Polytechnic University of Puerto Rico, 2020)
A manufacturing plant dedicated to the production of intraocular lens is observing a significant number of defects in their operations which has led to a decrease in the manufacturing yield. The project objective is to ...
Data Center Monitoring System Upgrade
(Polytechnic University of Puerto Rico, 2020)
The project was developed at the Headquarters of the Defense Commissary Agency (DeCA), located at Fort Lee, Virginia, that
operates nearly 240 commissaries worldwide. The Agency’s data center was experiencing a high ...
Obsolescence Management- Unknown Parts
(Polytechnic University of Puerto Rico, 2020)
In an aerospace program, an opportunity to improve the obsolescence process was identified. The DMAIC methodology was
implemented. The Bill of Materials was evaluated and it was found that there are parts with Unknown ...
Mejora del Rendimiento en los Procesos de Ejecución de Cubicaciones en Obras Civiles
(Universidad Politécnica de Puerto Rico, 2020)
Los pagos a subcontratistas y personal de obra fuera de los tiempos establecidos con demoras y con errores en los reportes de nóminas es una problemática que surge de manera muy seguida y trae consigo disgustos en el ...