Suche
Anzeige der Dokumente 21-30 von 62
Reduction of inventory discrepancies due incorrect bill of material in an electrical manufacturer
(Universidad Politécnica de Puerto Rico, 2020)
In the company EM, during the last inventory (2020), a lost cost of over US$100,000 was calculated due to incorrect bill of material or discrepancies related to deviations not implemented. This paper focuses on finding the ...
Trane Puerto Rico Contracting Transition Process Improvement
(Polytechnic University of Puerto Rico, 2020)
Trane Puerto Rico has established processes for conducting contracting work. The processes in place are adequate in most cases but may need adjustments in others. A case in point is the transition process. Before this ...
Thermal Modeling Process Optimization
(Polytechnic University of Puerto Rico, 2020)
Currently, Company XYZ conducts thermal validation using two approaches: full vehicle and local thermal models. In order to
perform these analysis, three different software are used. STAR-CCM+ is used to run full vehicle ...
Análisis de las mejores prácticas clínicas en el mercado como iniciativa para reducir los costos de los servicios hospitalarios en Puerto Rico
(Polytechnic University of Puerto Rico, 2020)
Los hospitales se enfrentan a una competencia sin precedentes tanto de proveedores de bajo costo como de competidores no
hospitalarios que desafían el pensamiento tradicional de que los hospitales son el centro de la ...
Estudio de viabilidad de adquisición electrónica en la industria hospitalaria
(Polytechnic University of Puerto Rico, 2020)
Los hospitales enfrentan problemas de adquisición que resultan en costos significativos debido a la pandemia de COVID-19. Estas compras representan un gran reto para garantizar la calidad de la atención al paciente. Con ...
Improvement to the Manufacturing Process for Screens
(Polytechnic University of Puerto Rico, 2020)
A company that fabricates screens, among other products, is not very effective as the manufacturing time of screens is longer than it is desired. The company wants to make changes to the current process and layout, focusing ...
Cost Effective Analysis of a Damaged Manufacturing Equipment
(Polytechnic University of Puerto Rico, 2020)
A fire in a production line of a chemical plant in Guymon, Oklahoma, caused damaged to a manufacturing pressure vessel. A
cost analysis was performed to determine if the pressure vessel needed to be repaired or replaced. ...
Creación De Sistema Estratégico en Mejora de Productividad y Eficiencia en HSE Company
(Polytechnic University of Puerto Rico, 2020)
Problemas gerenciales pueden desencadenar situaciones irremediables en un sistema de negocio. Esto sucedió en HSE Company. Malas estrategias, desorganización y no anticipar riesgos hicieron que no pudiera cumplir con los ...
Plan de mejoras de procesos en la creación de ambientes de desarrollo y producción
(Polytechnic University of Puerto Rico, 2020)
En el 2018, la empresa Seguros de Puerto Rico (SPR) obtuvo una clasificación 4.5 estrella de una agencia federal reguladora del
servicio de los planes de salud en los Estados Unidos. Para 2019, SPR tuvo una drástica ...
Mejoras del Sistema Pluvial de la Urbanización Villamar, Carolina PR
(Polytechnic University of Puerto Rico, 2020)
Los desagües pluviales ocasionaron en la urbanización Villamar condiciones de mayor envergadura tales como: el nivel de la Laguna San José estuviese por encima del nivel residencial, inundaciones residenciales, colapso de ...