Buscar
Mostrando ítems 461-470 de 492
Cost Effective Analysis of a Damaged Manufacturing Equipment
(Polytechnic University of Puerto Rico, 2020)
A fire in a production line of a chemical plant in Guymon, Oklahoma, caused damaged to a manufacturing pressure vessel. A
cost analysis was performed to determine if the pressure vessel needed to be repaired or replaced. ...
Improvement of the Daily Manufacturing Operations Productivity of the Injection Molding Department by at Least 5%
(Polytechnic University of Puerto Rico, 2020)
Productivity is the most significant factor in manufacturing industries. Low productivity of workers can have a great impact in the finances of an organization. In this project paper, the focus is to improve the manufacturing ...
Subcon Report Automation
(Polytechnic University of Puerto Rico, 2020)
This project consists of the automation of a report that is done manually on a daily basis at the Finance Department of an aerospace company in Aguadilla, Puerto Rico. By automating the report generation, it is expected ...
Improving Critical Parts Inventory for Fast Field Service Response
(Polytechnic University of Puerto Rico, 2020)
This study's focus is the evaluation of critical spare parts inventory for a service business organization to ensure adequate customer support. The study is carried out at a local provider for laboratory and process ...
Optimization of the Induction Solutions Preparation and Addition Process in Bulk Manufacturing at a Biopharmaceutical Plant
(Polytechnic University of Puerto Rico, 2020)
An optimization of the induction solutions manufacturing and addition processes, used during the protein generation in a Cell
Culture process is pursued at a Biopharmaceutical plant located in Juncos, Puerto Rico. ...
Medical Procedure Packs Missing Components Reduction
(Polytechnic University of Puerto Rico, 2020)
The project took place in a medical device company that manufactures custom procedure packs. During the pack assembly
process, components may be left out of the pack which causes the assembly process to stop to rework ...
Reducción de Costos de Piezas de Repuesto y Maximización del Taller Mecánico
(Polytechnic University of Puerto Rico, 2020)
El encargado de la supervisión del área de Mantenimiento, Almacén de piezas de Repuesto y Taller Mecánico de una industria de
instrumentos médicos tiene el presupuesto limitado para la operación del departamento. El ...
Reduction in lead times of manufacturing Product X
(Polytechnic University of Puerto Rico, 2020)
The project takes place in an Aerospace Company in Puerto Rico. The purpose of it was to reduce the lead times of a specific
product called Product X, the product that will benefit the company the most. Qualitative ...
Obsolescence Management- Unknown Parts
(Polytechnic University of Puerto Rico, 2020)
In an aerospace program, an opportunity to improve the obsolescence process was identified. The DMAIC methodology was
implemented. The Bill of Materials was evaluated and it was found that there are parts with Unknown ...
Solving a Problem of Delays in a Work Team
(Polytechnic University of Puerto Rico, 2020)
This project analyzes the work environment in a team that present delays in the delivery of tasks with the aim of reducing them. It’s a small and diverse team in an information technology services company that works from ...