Buscar
Mostrando ítems 711-720 de 819
Mejoramiento del proceso de estudios de campo e instalaciones
(Polytechnic University of Puerto Rico, 2019)
El proyecto que se presenta a continuación se compone del mejoramiento del proceso de estudios de campo e instalaciones en una empresa de telecomunicaciones. Aquí se encontrará un desglose de todas las reuniones con diversos ...
Analysis and Optimization of Employee Parking for Company XYZ
(Polytechnic University of Puerto Rico, 2012)
Company XYZ has the need to reduce costs and improve personnel safety. Current parking accommodations are costly and unsecure. To resolve this issues three possible solutions were analyzed: parking re-distribution, ...
Power Plant environmental cleaning schedule optimization
(Polytechnic University of Puerto Rico, 2013)
Since switching to natural gas as their primary fuel, the boilers at a power plant of the Puerto Rico Electric Power Authority are kept cleaner and with minimum environmental pollution. According to a consent decreed with ...
Capability Development Enhancement to Sustain Business Needs
(Polytechnic University of Puerto Rico, 2013)
Organizational capability is one of the most important qualities for a company to succeed. In order for a company to have a good
organizational capability, their employees need to be capable of completing their jobs on ...
Optimization of the Receiving Request Process for Jurisdiction and Classification
(Polytechnic University of Puerto Rico, 2019)
The purpose of the project is the centralization of jurisdiction and classification (JC) of commodities and technology in a single unit for the entire Pratt & Whitney organization, as well as to unify and standardize the ...
5S Method Implementation in Power Department’s Warehouse of the Tren Urbano of Puerto Rico
(Polytechnic University of Puerto Rico, 2013)
The Tren Urbano of Puerto Rico has a lot of material, equipment and tools to make the maintenance works. Many of them are electrical and there is a Power Department to make them. This department has been having problems ...
Idle Time Reduction in Formulation Room
(Polytechnic University of Puerto Rico, 2019)
The Amgen Manufacturing Limited formulation room was impacted by the increase of forecasted variable demand for 2019 and 2020. During the evaluation it was found that decreases in demand for certain months caused an increase ...
Orion’s Force Class Ship
(Polytechnic University of Puerto Rico, 2019)
The United States Navy (hereinafter referred to as Navy) submitted a request for proposals (RFP) for a new class of surface ships
titled Force Class Ship. Orion Industries submitted a proposal for their design which they ...
First Pass Yield Improvement on Casting Cell Using DMAIC Methodology
(Polytechnic University of Puerto Rico, 2019)
This research project was focused in the First Pass Yield improvement in a cell of a Medical Device Company. In order to improve the first pass yield, the DMAIC methodology was used. This research contributed to improve ...
United States Navy Force Projection Improvement Project
(Polytechnic University of Puerto Rico, 2019)
An increase presence of US Navy ships is required in the Pacific Theater to maintain stability in the region. The increase of operating time at sea for the ships increases the time required for maintenance and repairs ...