Reducing Branch Manager’s Back-Office Duties
(Polytechnic University of Puerto Rico, 2021)
In a local bank in Puerto Rico, the time that should be dedicated to increasing portfolio by branch managers was consumed mostly of back office tasks. The reason the operation is mostly back-office tasks is for the lack ...
Improvements to the Maintenance Manager Position
(Polytechnic University of Puerto Rico, 2021)
This project intends to show improvements to the position of Maintenance Manager in a company dedicated to the sale of
aggregates and concrete mix in the Bayamon area. A critical analysis of the company was carried out ...
Mejoras al Procesador de Tapones de la Línea de Viales
(Polytechnic University of Puerto Rico, 2021)
Se realizó un estudio en una farmacéutica en la cual el residuo creado por el exceso de tapones de goma que se caen al piso de
la maquina generaba pérdidas. Para reducir el residuo, se evaluaron varias alternativas, de ...
Tiempo de inactividad e impacto en el costo por mantenimiento durante el proceso de granulación en una industria farmacéutica
(Polytechnic University of Puerto Rico, 2021)
Durante el proceso de granulación en una industria farmacéutica localizada en Barceloneta, Puerto Rico, se identificaron factores
que estaban causando tiempo de inactividad del Granulador y el “Fluid Bed Dryer” (FBD) los ...
Reducción de Descarte de Unidades en la Línea de Llenado
(Polytechnic University of Puerto Rico, 2021)
En el proceso de llenado de unidades intravenosas de una planta manufacturera de dispositivos médicos se tiene una gran cantidad de descarte de unidades en todo el proceso. Se realizó un análisis a los mantenimientos ...
Improvement to the Manufacturing Process for Screens
(Polytechnic University of Puerto Rico, 2020)
A company that fabricates screens, among other products, is not very effective as the manufacturing time of screens is longer than it is desired. The company wants to make changes to the current process and layout, focusing ...
Cost Effective Analysis of a Damaged Manufacturing Equipment
(Polytechnic University of Puerto Rico, 2020)
A fire in a production line of a chemical plant in Guymon, Oklahoma, caused damaged to a manufacturing pressure vessel. A
cost analysis was performed to determine if the pressure vessel needed to be repaired or replaced. ...
Subcon Report Automation
(Polytechnic University of Puerto Rico, 2020)
This project consists of the automation of a report that is done manually on a daily basis at the Finance Department of an aerospace company in Aguadilla, Puerto Rico. By automating the report generation, it is expected ...
Optimization of the Induction Solutions Preparation and Addition Process in Bulk Manufacturing at a Biopharmaceutical Plant
(Polytechnic University of Puerto Rico, 2020)
An optimization of the induction solutions manufacturing and addition processes, used during the protein generation in a Cell
Culture process is pursued at a Biopharmaceutical plant located in Juncos, Puerto Rico. ...
Implementación de sistema de control de inventario con RFID
(Polytechnic University of Puerto Rico, 2020)
En una compañía de implementación de sistemas y venta de equipos, como impresoras y dispositivos portátiles para logísticas entre otros, requiere como parte de su reestructuración contar con un sistema de control de ...