Evaluation to Sleeves Used in Granulation Department for the Graduate Programs at Polytechnic University of Puerto Rico
(Polytechnic University of Puerto Rico, 2021)
The DMAIC methodology was applied to analyze a manufacturing system at Johnson & Johnson Pharmaceuticalsin Las Piedras, Puerto Rico. The methodology was used to improve the time for changing and ...
Audit Process Optimization in the Manufacturing Area
(Polytechnic University of Puerto Rico, 2021)
This project was developed to demonstrate a viable audit process optimization in the manufacturing area. The AbbVie site ubicated in Barceloneta, Puerto Rico,started with only one product back in ...
Process Time Reduction in Manufacturing Areas: Visual Valves Identification on Manufacturing Area specifically on Media Prep Area, Media Preparation tanks to Pursue Agility on the Visual inspections required before, during and after the Media Prep Solution are Prepared
(Polytechnic University of Puerto Rico, 2022)
Time of production process and associate activities were evaluated for Media Prep manufacturing process on Juncos, P.R. The voice of the customer requested reduced time inspection process before, ...
Mejora en el Proceso de Limpieza en los Equipos de Manufactura
(Polytechnic University of Puerto Rico, 2022)
Durante estudios de tiempo en los procesos en una farmacéutica en Puerto Rico se identificó un tiempo prolongado en la ejecución de limpieza de la Compresora que es compartida con varios productos .Por esta razón ...
Mejoras al Proceso de Empaque parala Jurisdicción de China
(Polytechnic University of Puerto Rico, 2022)
En los últimos dieciocho meses, el mundo ha confrontado retos con el suministro de materia prima. En esta empresa no es la excepción, además, la productividad redujo, los desperdicios aumentaron y el tiempo de ...
Improve HTS and Schedule B Classification Process to Reduce the Turnaround Time in a Commodity Shipments Compliance Project
(Polytechnic University of Puerto Rico, 2022)
The HTS and Schedule B classification process adds two days to the turnaround time of the standard process of the Commodity Shipments Compliance team. Throughout 2021, 108 of 326 requests approvals, requiring HTS ...
Reducing Downtime Due to Glove Breakage in Manufacturing Areas
(Polytechnic University of Puerto Rico, 2022)
Lean manufacturing was developed for maximizing resource utilization through the minimization of waste. During certain tasks in the Manufacturing Area, gloves tended to break. I propose that we need to reduce the walk ...
Improving the flow of Sampling Analysis of Manufacturing Batches to reduce time and Increase the Capacity of the Process
(Polytechnic University of Puerto Rico, 2022)
This research will focus on analyzing the flow of sample analysis of manufacturing batches to reduce time and increase the capacity of the process in the laboratories. A laboratory in the pharmaceutical industry receives ...
Redesign of a Space in the Autopsy Room Assigned for the Preparation of Biological Samples for Toxicological Analysis by Using DMADV Technique
(Polytechnic University of Puerto Rico, 2022)
The government agency of the Institute of Forensic Sciences recently received the necessary accreditations to be able to provide the essential service it offers to the citizens of Puerto Rico. The objective of this project ...
Using Six Sigma Methodology and Technology to Improve Quality Audit Process Cycle Time
(Polytechnic University of Puerto Rico, 2022)
Currently, at the “Pharmaceutical Company Y”, the cycle for launching a product can take an average of 46.7 days. The proposal for this study seeks to reduce this cycle time to 30 days. This project illustrates the ...