Search
Now showing items 1-10 of 18
Increase Productivity in a Manufacturing Department of a Medical Devices Company
(Polytechnic University of Puerto Rico, 2013)
In all companies the productivity is a
very important metric because is the way to make
sure that we optimize our resources and time. Is the
way to measure if we are manufacturing as
expected and with the required ...
Equipment Validation Standardization for Project Implementation Time Reduction of Automated Manufacturing Platforms
(Polytechnic University of Puerto Rico, 2012)
Abstract - Medical Device regulated industry requires extensive validation work. Using the latest automation technology for the process equipment to eliminate the operator interaction brings the challenge of how fast the ...
Cost & Cycle Time Reduction and Increased Production on CNC Machines
(Polytechnic University of Puerto Rico, 2014)
There are a lot of different types of
manufacturing industries. Some of the similarities,
in the majority, is the need to reduce cost, cycle
tyme and consequently increase productivity. There
are several methodologies ...
Surgical Technologies Clean Room Lines Capacity Improvement
(Polytechnic University of Puerto Rico, 2015)
In today’s competitive market, medical
device manufacturing companies need to
continuously innovate their products and process in
order to maintain a leader position on the medical
devices industry. Quality and Cost ...
Battery Assembly Re-design in a Medical Device Company
(Polytechnic University of Puerto Rico, 2012)
Abstract - Today, customer complaints is a strategic business metric for the organizations to measure the customer satisfaction and product’s performance. During YR2011, an adverse trend on complaints per million (CPMs) ...
Improve Material Flow at Supplier
(Polytechnic University of Puerto Rico, 2012)
Abstract ⎯ This project will be focused in reducing the high lead time that characterizes one of the suppliers in a Medical Device Organization. By reducing the lead time of this supplier, the organization expects to have ...
Workmanship Error at Assembly Line in a Medical Device Company
(Polytechnic University of Puerto Rico, 2012)
Abstract — In a Medical Device Company a production line had an increase of non-conformances in 2011. The category for the increase was workmanship error. These failures result in cost of poor quality due to quality holds. ...
Development and Evaluation of Prototype Heat Shrink Masking Machine
(Polytechnic University of Puerto Rico, 2016)
This design project consists in
developing a prototype equipment to reduce the
heat variability produced by the current heat shrink
installation process. A heat Shrink tubing is a
shrinkable plastic tubing commonly ...
Improvement of the Statistical Techniques Quality System Element in a Medical Device Industry
(Polytechnic University of Puerto Rico, 2012)
Abstract - This project is focused on reducing the compliance risk of a Medical Device Manufacturer by improving its Statistical Techniques Quality System Element. Lean Sigma Methodology was used to identify the inputs or ...
Tracking System for Useful Life of an Insulin Pump Motor
(Polytechnic University of Puerto Rico, 2016)
This research project was focused in
the implementation of a Tracking System for the
useful life of an infusion pump’s motor. This
component is a sub-assembly of the infusion pump
which is used to deliver fluids into ...