Buscar
Mostrando ítems 1-10 de 22
Time Cycle Reduction of the Scrap Process in a Medical Device Company
(Polytechnic University of Puerto Rico, 2011)
As part of an assessment performed for continuous improvement it was identified that the Nonconformance (NC) Timeline metric shows 23% over the goal of 30 days closure. From the list of NC Reports (NCR) impacting this ...
Reduction of Scrap in Manufacturing Line B-1 Using Six Sigma Manufacturing Methodology
(Polytechnic University of Puerto Rico, 2012)
Abstract - In this research, the focus was in a manufacturing production line of receptacles assembly. The receptacles are the finish good of this production line. In this process the receptacle is build completely starting ...
PRM Operations Cores Cell Takt Time Kaizen
(Polytechnic University of Puerto Rico, 2015)
This article refers to, how UTAS handles
the optimization of a CORE a cell in the
manufacturing process. Companies have waste that
can be reduce with an optimization of the
manufacturing process. Steps to accomplish ...
Packaging Line Efficiency Improvements with the Implementation of a Centralized Packaging Line Control System
(Polytechnic University of Puerto Rico, 2015)
Efficiency is a process measurement of
the ability of generating a required output with the
minimum amount of resources. A high efficiency is
crucial for a packaging line as it is an important
aspect of cost control ...
Combination Products Regulation – A Guide to Compliance
(Polytechnic University of Puerto Rico, 2015)
The Food and Drug Administration
(FDA or Agency) has issued a regulation on the
current good manufacturing practices (CGMP’s)
requirements applicable to combination products.
The new rule is intended to promote the ...
Installation of a New Cognex Vision System for Quality Inspection on PDS (ATS5889) Machine at Surgical Device Company in the Eastern Region of Puerto Rico
(Polytechnic University of Puerto Rico, 2014)
There is a 4-6% scrap on PDS
(Protected Disposable Scalpel) machine actual
vision system. It is important for the company to
manage more efficiently and try to reduce scrap
percentage through the entire process of the ...
Fill and finish Production Line End Effectors Improvements for Reducing Rejected Units due to Robot Pickup Failures
(Polytechnic University of Puerto Rico, 2014)
Since the production of parenteral is
more regulated and complicated, it makes the
manufacture investment cost higher in comparison
with other dosage forms. As result, is important to
apply lean tools in order to reduce ...
Reduction of Time in a Manufacturing Process for a Pharmaceutical Company Located in Puerto Rico
(Polytechnic University of Puerto Rico, 2012)
Abstract - The project is developed in a chemical plant of a pharmaceutical company in Puerto Rico. In 2011 the company had an increase in market demand of the active ingredient of one product. To ensure the profit plan, ...
Improve Yield of the Replication Line for DVD9/DVD5 for a Technology Company
(Polytechnic University of Puerto Rico, 2012)
Abstract ⎯ Replication process is used to mold the disc via injection molding, this process is used for high volume runs due to process stability. Currently the yield of the replication line is around 85-90%, the objective ...
Increasing Capacity by Designing a New Drying Process at a Manufacturing Plant
(Polytechnic University of Puerto Rico, 2012)
Abstract ⎯ High oil price is one of the major factors for this twenty-first century global economic recession. Inevitably everyone’s mindset has changed towards energy and the focus is towards finding renewable energy that ...