Mostrar el registro sencillo del ítem

dc.rights.licenseAll rights reserveden_US
dc.contributor.advisorNieves Castro, Rafael A.
dc.contributor.authorDíaz Marrero, Jessuelly E.
dc.date.accessioned2020-12-15T13:42:47Z
dc.date.available2020-12-15T13:42:47Z
dc.date.issued2010
dc.identifier.citationDíaz Marrero, J. E. (2010). Production line improvement using DMAIC tool in an electrical production plant [Unpublished manuscript]. Graduate School, Polytechnic University of Puerto Rico.en_US
dc.identifier.urihttp://hdl.handle.net/20.500.12475/991
dc.descriptionDesign Project Article for the Graduate Programs at Polytechnic University of Puerto Ricoen_US
dc.description.abstractToday, there is much competition between the manufacturers of electronics products. This creates a need for the manufacturers to develop processes that can supply the client demand within a required time and a specified quality. The studied production line had productivity problems, since it was never able to reach the 95% productivity level established by the company, and had a backorder cost of $26K. These factors affected the availability of products required by the customer. Using the DMAIC tool the main factors that affected the production output were properly identified to correct the problem of a production line that did not meet adequately the client demand. The initials stand for: Define Measurement, Analyze, Improve and Control. As a result of working with causes affecting the productivity problems of the studied area, the productivity was increased from 85% to 96.7% and Backorder costs were reduced to $4,300. Key Terms: DMAIC, Sub. assemblies, Molding Parts, 5’S.en_US
dc.language.isoen_USen_US
dc.publisherPolytechnic University of Puerto Ricoen_US
dc.relation.ispartofManufacturing Engineering;
dc.relation.ispartofseriesSpring-2010;
dc.relation.haspartSan Juanen_US
dc.subject.lcshSix sigma (Quality control standard)en_US
dc.subject.lcshElectronics plants
dc.subject.lcshPolytechnic University of Puerto Rico--Graduate students--Research
dc.titleProduction Line Improvement Using DMAIC Tool in an Electrical Production Planten_US
dc.typeArticleen_US
dc.rights.holderPolytechnic University of Puerto Rico, Graduate Schoolen_US


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem