Dominguito Transformer Overload
(Polytechnic University of Puerto Rico, 2023)
Assessments were made in Arecibo, Puerto Rico, between 2021 and 2023 to determine the root cause for loading issues that were occurring in this area. From this investigation, it was found that Dominguito substation has an ...
Desarrollo de un Sistema de Control de Inventario y Mantenimiento de Equipos
(Polytechnic University of Puerto Rico, 2021)
Como parte de la gestión de incorporar equipo dentro de unas nuevas instalaciones, se desarrolló un sistema de control
de inventario y mantenimiento dentro de un almacén de una agencia militar. Las cinco fases de la ...
Past Due Reduction on 37mm Syringe Filters Manufacturing Line
(Polytechnic University of Puerto Rico, 2021)
In Pall Life Sciences Puerto Rico, the past due on the 37mm manufacturing line was at $262,000 and continues increasing. The root cause for this issue is due to a mix of material shortage and customer demand increase. After ...
Improve HTS and Schedule B Classification Process to Reduce the Turnaround Time in a Commodity Shipments Compliance Project
(Polytechnic University of Puerto Rico, 2022)
The HTS and Schedule B classification process adds two days to the turnaround time of the standard process of the Commodity Shipments Compliance team. Throughout 2021, 108 of 326 requests approvals, requiring HTS ...
Statistical Sampling Plan Alternatives for Seal Strength Testing on Pre-sealed Tyvek® Bags
(Polytechnic University of Puerto Rico, 2022)
Seal strength is an important quality of sterile barrier systems used for Pharmaceutical and Medical Device Packaging operations, and subject to strict quality control industry-wide. This study evaluated the feasibility ...
Analysis and Recommendation of Landslide and Road Damage on State Road PR-167, Km 7.2 Naranjito, PR
(Polytechnic University of Puerto Rico, 2022)
The State Road PR-167 segment, where the project is located, is a primary state highway road bordering La Plata River, in the municipality of Naranjito, that serves as a connector between Naranjito and Comerío and represents ...
Automatization of the Patch and Serter Installation System’s Sensor Transference Step
(Polytechnic University of Puerto Rico, 2022)
The Patch and Serter Installation System is one of the multiple computerized systems that composes the Cell Operating System
(COS) assembly lineat Medtronic Juncos Campus as part of the Project Synergy. This equipment ...
Reducing Downtime Due to Glove Breakage in Manufacturing Areas
(Polytechnic University of Puerto Rico, 2022)
Lean manufacturing was developed for maximizing resource utilization through the minimization of waste. During certain tasks in the Manufacturing Area, gloves tended to break. I propose that we need to reduce the walk ...
Improving the flow of Sampling Analysis of Manufacturing Batches to reduce time and Increase the Capacity of the Process
(Polytechnic University of Puerto Rico, 2022)
This research will focus on analyzing the flow of sample analysis of manufacturing batches to reduce time and increase the capacity of the process in the laboratories. A laboratory in the pharmaceutical industry receives ...
La Gerencia de Construcción en Proyectos con Fondos Federales
(Polytechnic University of Puerto Rico, 2023)
El paso del Huracán María provocó devastación en Puerto Rico. A consecuencia de esto, se asignaron fondos federales para la reconstrucción de la infraestructura. Existen áreas de mejoramiento que se pueden atender con ...