Suche
Anzeige der Dokumente 21-30 von 89
Workmanship Error at Assembly Line in a Medical Device Company
(Polytechnic University of Puerto Rico, 2012)
Abstract — In a Medical Device Company a production line had an increase of non-conformances in 2011. The category for the increase was workmanship error. These failures result in cost of poor quality due to quality holds. ...
Application of Quality Improvement Tools to a Perishables Food Distribution Center to Reduce Product Return and Improve Customer Satisfaction
(Polytechnic University of Puerto Rico, 2015)
Product Return and Customer
Satisfaction have a high impact on the financial,
customer service and quality aspects of the food
distribution and storage in the perishables food
industry. A Lean Six Sigma approach was ...
Integration of Lean Six Sigma and Automation for Process Optimization in Surface Mount Technology (SMT) Assembly Line
(Polytechnic University of Puerto Rico, 2012)
Abstract - This project was conducted in an Electronic Manufacturing Company that manufactures motor speed controllers for battery-powered and electric vehicles for airport, golf, material handling, and medical mobility ...
Hair Salon Process Improvement: A Lean Six Sigma Application to Service Industry
(Polytechnic University of Puerto Rico, 2012)
Abstract - In this project the waiting elapsed time of a customer will be analyzed and standardized to reduce or eliminate this time. The main objective of this project is to keep customer waiting time within 0 to 15 ...
Design and Implementation of an Automated Assembly Line for a Manufacturing Facility
(Polytechnic University of Puerto Rico, 2012)
Abstract - As the field of automation has become more widespread, more companies, still mostly using manual labor, are looking into it to increase their productivity. However the transition between manual operation and ...
Improvement of a Public Utility Authority Complaint Responding System
(Polytechnic University of Puerto Rico, 2012)
Abstract - This project will be conducted in the Operations Department of a Public Utility Authority. The project will focus on the improvement of the agency complaints respond service. The Six Sigma DMAIC model was used ...
Improve Material Flow at Supplier
(Polytechnic University of Puerto Rico, 2012)
Abstract ⎯ This project will be focused in reducing the high lead time that characterizes one of the suppliers in a Medical Device Organization. By reducing the lead time of this supplier, the organization expects to have ...
Implementación de Lean Six Sigma en Procesos de Servicio del Área de Mantenimiento
(Polytechnic University of Puerto Rico, 2016)
El presente artículo describe una
propuesta de mejora en los procesos de servicio de
mantenimiento ofrecidos en el Residencial Luis
Muñoz Morales en Cayey. Analizado desde la
perspectiva de la reducción de ineficiencias ...
Temperature and Speed Analysis of Skinetta Banding Machine and Heat Tunnel Conveyor at Chocolate Packaging Line
(Polytechnic University of Puerto Rico, 2014)
Food and Drug Administration (FDA)
regulates pharmaceutical industries. With this
regulations industries are forced to maintain a high
quality standard for their product. Novartis
manufactures OTC products as well as ...
Engineering Standard Work Proficiency Reports Automation for the Aerospace Industry
(Polytechnic University of Puerto Rico, 2012)
Abstract - The study was conducted in an Aerospace Industry located in Isabela, Puerto Rico. The objectives of this project were to eliminate report errors and to reduce the report development from 5 days to less than 1 ...