Buscar
Mostrando ítems 31-40 de 54
Cycle time reduction in an administrative process using Six-Sigma tools
(Polytechnic University of Puerto Rico, 2020)
The long cycle time in the outsourcing process of niche skill set has been an obstacle for program execution and customer delivery. The administrative process was addressed with the use of Six Sigma tools to reduce waste ...
Creación De Sistema Estratégico en Mejora de Productividad y Eficiencia en HSE Company
(Polytechnic University of Puerto Rico, 2020)
Problemas gerenciales pueden desencadenar situaciones irremediables en un sistema de negocio. Esto sucedió en HSE Company. Malas estrategias, desorganización y no anticipar riesgos hicieron que no pudiera cumplir con los ...
The Construction Manager-General Contractor method for construction of transportation projects in Puerto Rico
(Polytechnic University of Puerto Rico, 2020)
The Transportation infrastructure always needs investment. Fiscal problems at government require the use of innovative solutions
to optimize the use of public funds. The traditional contract method, currently used, ...
Manejo de la Productividad de los Empleados Utilizando Evaluación de 360o
(Polytechnic University of Puerto Rico, 2020)
Este proyecto se enfoca en la investigación del manejo de la productividad de los empleados utilizando el método de evaluación de 360 grados. El mismo tuvo una duración aproximada de dos meses, realizada a empleados de ...
Diagnóstico del Estado Actual del Proceso de Elaboración y Empaque del Producto Enlatado y Análisis de su Problemática de Sobrepeso Usando Seis Sigma
(Polytechnic University of Puerto Rico, 2020)
Se estudia el proceso de fabricación y empaque del producto enlatado de Industrias La Coruña debido a que se obtiene un producto con un peso mayor al declarado en la etiqueta causado por la variabilidad en los subprocesos, ...
Continuous Navy Ships Process Improvement: Six Sigma, Lean Thinking, and Theory of Constraints
(Polytechnic University of Puerto Rico, 2020)
Long waiting time in the equipment repair process in Norfolk Naval Shipyard is an actual problem. The main cause of this problem is the poor knowledge of the continuous process improvement techniques as Six Sigma, Lean ...
Optimización de los Procesos de Calidad en “Rainbow Research Optics”
(Polytechnic University of Puerto Rico, 2020)
Este proyecto se realizó en la compañía “Rainbow Research Optics” y surgió debido a la gran cantidad de piezas devueltas por
los clientes en los meses de diciembre 2019 a febrero 2020. Luego de estudiar el problema se ...
Improving Employee Retention at Pratt & Whitney Puerto Rico
(Polytechnic University of Puerto Rico, 2020)
When a company has a major change in scope and culture, the tendency is to grow and adapt. The company in question, Pratt & Whitney, experienced growth but the adaptation has become problematic. Their growth has caused ...
Clasificación ABC del Inventario de Materias Primas
(Universidad Politécnica de Puerto Rico, 2020)
La investigación se realizó en una empresa que elabora productos farmacéuticos, y surgió de la necesidad de clasificar el inventario de materias primas y aprovechar una expansión que se va a realizar, la cual afecta la ...
WECI Inventory Reduction and Just-In-Time Implementation
(Polytechnic University of Puerto Rico, 2020)
The organization studied showed substantially high levels of inventory, thus a reduction was in need. Given the little information
available to implement this in a service environment, a new approach was needed. A mix ...