Suche
Anzeige der Dokumente 11-20 von 109
NPI Workgroups Management System
(Polytechnic University of Puerto Rico, 2021)
Organizations with virtual teams and its resources located in different geographical locations have a growing concern on the impact of turnaround time and work-life balance. As a result, the main challenges are the coverage ...
The Impact of Employee Absenteeism in Fast-Tracks Projects
(Polytechnic University of Puerto Rico, 2021)
Fast-tracking is a project management technique where activities are performed simultaneously, instead of waiting for each task to be completed separately. When personnel do not show for work, it creates a negative impact. ...
OneDay Toric Yield Improvement
(Polytechnic University of Puerto Rico, 2021)
This project was developed in CooperVision, Juana Diaz Site, specifically for the OneDay Toric product. It is focused on the Wet
Process of the product life cycle. There was a gap between two manufacturing technologies ...
Aumento de la confiabilidad de las subestaciones: UASD, Matadero y Centro de Operaciones de Herrera
(Universidad Politécnica de Puerto Rico, 2020)
Edesur Dominicana es una empresa de distribución de energía eléctrica, perteneciente al estado dominicano, donde su zona de operación es la parte sur de República Dominicana. Al tener en los últimos años una cantidad de ...
Diseño de Manual para Habilitación de Cervecería Artesanal
(Universidad Politécnica de Puerto Rico, 2020)
En un mundo en constante evolución, donde el consumismo lleva a procesos industrializados de producción masiva de todos los bienes y servicios, la producción artesanal se ha convertido en un lujo que promueve el crecimiento ...
Optimización en la venta y crianza de los pollos de granja de la empresa Escoto a tecnologia digital
(Universidad Politécnica de Puerto Rico, 2020)
Actualmente en la granja de pollos Escoto, el proceso de anotar la información en cuadernos para la crianza y venta es lento y conduce a perdida de información. Se buscó usar tecnología para mejorar esta área. Se crearon ...
Lightspeed System 5 Cell Capacity Increase, RWDD Corporation
(Universidad Politécnica de Puerto Rico, 2020)
The Company RWDD is working in a new product release in 2021. Alongside this release, the marketing team is expecting a 10% increase in demand for this product. This forecast will require a project team is dedicated in the ...
Broken Bases Scrap reduction in FD line
(Universidad Politécnica de Puerto Rico, 2020)
A key reference point to verify the efficiency of a production line is its scrap performance. The FD breaker production line of company “ABC” is currently facing challenges due to broken nubs and corners defects of 3-pole ...
SICD Manufacturing Scrap Yield Improvement
(Polytechnic University of Puerto Rico, 2021)
Defects that occur during the manufacture of a product are consider a problem that affects the yield rate of all manufacturing lines
around the world. The Subcutaneous Implantable Cardioverter Defibrillator (SICD) ...
Substation Transformer Replacement Plan
(Polytechnic University of Puerto Rico, 2021)
About half of the Gainesville Regional Utilities (GRU) substation transformers are above their industry usage limit standard of 45 years and are prone to catastrophic failure. This study critical health data was captured ...