Impacto de la Terminación de las Superficies del Material Base Para la Adherencia en el Proceso de Sobremoldeo
(Universidad Politécnica de Puerto Rico, 2020)
El sobremoldeo consiste en el moldeo por inyección de una sustancia sobre otra. El propósito de estas tecnologías es producir componentes multifuncionales con una variedad de colores y/o materiales y unir las características ...
The Impact of COVID-19 in the A/E/C Industry
(Polytechnic University of Puerto Rico, 2021)
The project establishes a guide that will aid the A/E/C industry in implementing organizational change during times of adversity,
such as what is being experienced due to the COVID-19 pandemic, in order to create a proactive ...
Application of Time Management to Minimize Costs when Analyzing Construction Variances
(Polytechnic University of Puerto Rico, 2021)
Minimizing construction costs by reducing construction variances improves a company’s competitive advantage, especially in a
complex market. Using data from a construction company in the Dallas-Ft. Worth metropolitan area, ...
Changeover Process Optimization for a Medical Device Manufacturer in Haina, Dominican Republic
(Universidad Politécnica de Puerto Rico, 2020)
The medical device industry has the critical mission of saving and sustaining lives of patients being affected by chronical diseases. To these companies, having more available time to produce will enable and facilitate ...
ACI-HERZOG Pretreatment Plant Effluent Surfactant Reduction
(Polytechnic University of Puerto Rico, 2021)
ACI-HERZOG is the firm contracted to maintain and operate the Puerto Rico Tren Urbano system. As part of their duties, they are required to wash down train cars periodically. The water generated from the wash down process ...
NPI Workgroups Management System
(Polytechnic University of Puerto Rico, 2021)
Organizations with virtual teams and its resources located in different geographical locations have a growing concern on the impact of turnaround time and work-life balance. As a result, the main challenges are the coverage ...
The Impact of Employee Absenteeism in Fast-Tracks Projects
(Polytechnic University of Puerto Rico, 2021)
Fast-tracking is a project management technique where activities are performed simultaneously, instead of waiting for each task to be completed separately. When personnel do not show for work, it creates a negative impact. ...
OneDay Toric Yield Improvement
(Polytechnic University of Puerto Rico, 2021)
This project was developed in CooperVision, Juana Diaz Site, specifically for the OneDay Toric product. It is focused on the Wet
Process of the product life cycle. There was a gap between two manufacturing technologies ...
SICD Manufacturing Scrap Yield Improvement
(Polytechnic University of Puerto Rico, 2021)
Defects that occur during the manufacture of a product are consider a problem that affects the yield rate of all manufacturing lines
around the world. The Subcutaneous Implantable Cardioverter Defibrillator (SICD) ...
Substation Transformer Replacement Plan
(Polytechnic University of Puerto Rico, 2021)
About half of the Gainesville Regional Utilities (GRU) substation transformers are above their industry usage limit standard of 45 years and are prone to catastrophic failure. This study critical health data was captured ...