Search
Now showing items 1-4 of 4
Applying Lean Manufacturing to Minimize Inspection Time in a Medical Device Company
(Polytechnic University of Puerto Rico, 2012)
Abstract - This research is conducted in medical devices manufacturing company that makes a product to be used on the treatment of female stress urinary incontinence resulting from urethral hyper mobility and intrinsic ...
Improve Material Flow at Supplier
(Polytechnic University of Puerto Rico, 2012)
Abstract ⎯ This project will be focused in reducing the high lead time that characterizes one of the suppliers in a Medical Device Organization. By reducing the lead time of this supplier, the organization expects to have ...
Workmanship Error at Assembly Line in a Medical Device Company
(Polytechnic University of Puerto Rico, 2012)
Abstract — In a Medical Device Company a production line had an increase of non-conformances in 2011. The category for the increase was workmanship error. These failures result in cost of poor quality due to quality holds. ...
Improvement of the Statistical Techniques Quality System Element in a Medical Device Industry
(Polytechnic University of Puerto Rico, 2012)
Abstract - This project is focused on reducing the compliance risk of a Medical Device Manufacturer by improving its Statistical Techniques Quality System Element. Lean Sigma Methodology was used to identify the inputs or ...