Buscar
Mostrando ítems 91-100 de 246
Toxoplasma IgG Quality Control Testing Optimization
(Polytechnic University of Puerto Rico, 2013)
This project explores a lean initiative of a multinational healthcare company related to a Toxoplasma IgG (protozoan parasite) quality control test. The objective was to reduce the test’s cycletime, material consumption ...
WECI Inventory Reduction and Just-In-Time Implementation
(Polytechnic University of Puerto Rico, 2020)
The organization studied showed substantially high levels of inventory, thus a reduction was in need. Given the little information
available to implement this in a service environment, a new approach was needed. A mix ...
Second Row 60% Seat Cushion Optimization
(Polytechnic University of Puerto Rico, 2020)
This paper discusses changes in a seat mechanism design to address an issue found as part of automotive validation. For an automotive manufacturer, prototype vehicles were found to have insufficient retention of the second ...
Industrial Plant Equipment Maintenance Strategy
(Polytechnic University of Puerto Rico, 2020)
At Robins Air Force Base, specifically in the engineering equipment maintenance department, a problem has been identified in the management of labor. Equipment / machineries used in the production area suffer from high ...
Ultrasonic Welding Process Improvement for the Scrap Reduction of a Medical Device
(Polytechnic University of Puerto Rico, 2020)
A medical device company in Puerto Rico aims to improve an Ultrasonic Welding Process of a high-volume bone shredding medical device. The current process yield is 93% and must be at least 95% to meet the manufacturing site ...
Improvement of the Daily Manufacturing Operations Productivity of the Injection Molding Department by at Least 5%
(Polytechnic University of Puerto Rico, 2020)
Productivity is the most significant factor in manufacturing industries. Low productivity of workers can have a great impact in the finances of an organization. In this project paper, the focus is to improve the manufacturing ...
Aumento en entrega a tiempo al cliente en línea de producción
(Polytechnic University of Puerto Rico, 2020)
El aumento en entrega a tiempo es un factor esencial para mantener relaciones comerciales con el principal cliente de la
corporación. Cambios de órdenes prolongados, desorganización en la línea de manufactura y la falta ...
Process Improvement of Equipment Support Project Requests
(Polytechnic University of Puerto Rico, 2020)
A project request package moves through five different departments: Pre-Induction, Engineering Design, Planning, Material and
Execution. The project request package is constantly returned to a previous department for ...
Reduction and mitigation of foreign matter observed in product ABC
(Polytechnic University of Puerto Rico, 2020)
During the past three years, a manufacturing company for medical devices on the west side of Puerto Rico has been in the need of evaluating and mitigating the causes behind an increase in complaint incidents reported due ...
Incrementar la capacidad de producción manufacturera en el interruptor residencial auto Q una pulgada
(Polytechnic University of Puerto Rico, 2020)
Recientemente la compañía ABB adquirió la división de GE Industrial Solution con la misión de ganar una mayor participación en el mercado de las Américas. A inicios del tercer trimestre del año 2020 el volumen de producción ...