Search
Now showing items 821-830 of 851
Reduce Work Time Delivery, while Improving Quality and Customer Satisfaction
(Polytechnic University of Puerto Rico, 2016)
A military production process currently
being worked at a company has been delivered with
defects to the customers and to prepare the final
delivery package took around twenty four hours.
The objectives of this ...
The Insufficient Capacity of the HVAC system in the original GMD Building of Collier County
(Polytechnic University of Puerto Rico, 2016)
Collier County is located in the Southwest of Florida. The Collier family constructed the Growth Management Division Building in 1989, which was bought by the County to establish government offices. Through the years, ...
Accommodating expanding company personnel after office building space limit has been reached
(Polytechnic University of Puerto Rico, 2016)
For this project, the problem of needing to further hire employees after a company has reached its maximum employee limit was considered to be solved. Several options were put to use in an effort to stave off exceeding the ...
Conference Room Management Optimization
(Polytechnic University of Puerto Rico, 2016)
A formula is used to determine the optimum distribution of conference rooms for Infotech Aerospace Services, an engineering
services company with 1,000 employees. Final recommendation is 8 tiny rooms (up to 2 people), ...
New Dewatering Belt Filter Press System
(Polytechnic University of Puerto Rico, 2016)
The new belt filter press that was installed recently will help the company to reduce labor cost, polymer usage as well as improve dewatering process. Actually running an old belt filter press did not help to dewater ...
Improvement and Integration in High Efficiency Equipment to Reduce Energy Cost
(Polytechnic University of Puerto Rico, 2016)
The application of improved models of energy management is vital, because it generates continuous improvement, optimizes energy efficient and strengthens the culture of preservation. Incorporating Energy Efficiency aims ...
PARM-IT Process Robustness
(Polytechnic University of Puerto Rico, 2016)
Long turnaround times to complete requests, mistakes performed by the employees, and ineffective forms used by the clients to submit their requests are some of the problems faced by the employees handling the PARM-IT ...
Reduction of Finished Goods Inventory in Masterpact: Breakers and Cradles Lines
(Polytechnic University of Puerto Rico, 2017)
At the moment, there is no trigger for internal demand or set capacity to build internal orders of breakers or cradles. This results in misuse capacity and high inventory levels of MPACT finish goods. The purpose of the ...
Registro Electrónico para el Laboratorio de Reactivos
(Polytechnic University of Puerto Rico, 2017)
Este escrito aborda un problema en el área del laboratorio de reactivos donde se utiliza un proceso puramente manual para documentar los detalles de la preparación del producto y también el reporte final el cual libera al ...
Optimize and Automate the Documentation Process in the Manufacturing Granulation Process
(Polytechnic University of Puerto Rico, 2017)
During the past year, the pharmaceutical industry has embraced many situations that encourage the human resource of each company to improve and develop the organization. Integrating the lean manufacturing principles can ...