Buscar
Mostrando ítems 351-360 de 575
Minimización de Sobrecostos del Proyecto #20220017 de la Compañía de Construcción Metro Express Inc.
(Polytechnic University of Puerto Rico, 2023)
Los sobrecostos en la Metro Express han generado problemas de rentabilidad graves para la compañía debido a la falta de organización y control en los presupuestos con respecto a los objetivos trazados. Por medio de la ...
Enhancing Aerospace Systems Performance with Agile Framework
(Polytechnic University of Puerto Rico, 2023)
This paper presents a case study on implementing Agile methodology in aerospace engineering, with a focus on an engine design
project. The aim was to transition to a new SysML program called Cameo, to enhance team ...
Idle Time & Scrap Reduction on a Laser Production Cell
(Polytechnic University of Puerto Rico, 2023)
This project focuses on the application of the Define-Measure-Analyze-Improve-Control (DMAIC) methodology to improve the efficiency of a laser production cell within a medical device company. The company currently faces ...
Design and Implementation Process to Optimize Raw Material Inspection Methods
(Polytechnic University of Puerto Rico, 2023)
VitalTech Innovation, LLC is a medical device company targeted to patients diagnosticated with scoliosis or other medical conditions that affects the spinal/cervical system by significantly improving the management and ...
Characterization and Extrusion Qualification Process of Introducers/Dilators at Edwards Lifesciences Puerto Rico
(Polytechnic University of Puerto Rico, 2022)
Edwards Lifesciences is experiencing a high demand for Introducers/Dilators. The company decided to produce the Introducers/Dilators single lumen catheters shafts tubing in Añasco, Puerto Rico site. To implement this new ...
Improvements in the production and packaging of personal care products through the implementation of Lean Manufacturing
(Polytechnic University of Puerto Rico, 2022)
The manufacturing sector for personal care and beauty products is one of the most competitive today, creating the need to innovate and improve processes to remain competitive. This project used the DMAIC methodology and ...
Improvement of Kanban Inventory System Management
(Polytechnic University of Puerto Rico, 2022)
An increase in scrap of Kanban inventory has been reported in a medical device company. The main causes of the reported condition are the lack of visibility of inventory levels and inadequate execution of firs-in-first-out ...
Productivity Increase on Manufacturing Line A
(Polytechnic University of Puerto Rico, 2022)
In company that shall remain anonymous, Manufacturing Line A was underperforming, often falling back in orders. Therefore, the company decided to put in place a project to look at increasing productivity in this high-mix ...
Improving micromanagement methods used in a software engineering organization
(Polytechnic University of Puerto Rico, 2022)
Management groups within businesses are constantly striving to implement new methods of tracking tasks. Micromanagement has become a popular method in modern times because of the level of detail that this method can manage. ...
Damaged cable solution on F-35 electric motor on Aerospace Industry
(Polytechnic University of Puerto Rico, 2022)
Broken wires on the electromagnetic motor of the F-35 aircraft is a problem that negatively impacts the production line. Each
broken wire defect is equivalent to a loss of $6,000. The major causes of these broken cables ...