Application of Time Management to Minimize Costs when Analyzing Construction Variances
(Polytechnic University of Puerto Rico, 2021)
Minimizing construction costs by reducing construction variances improves a company’s competitive advantage, especially in a
complex market. Using data from a construction company in the Dallas-Ft. Worth metropolitan area, ...
ACI-HERZOG Pretreatment Plant Effluent Surfactant Reduction
(Polytechnic University of Puerto Rico, 2021)
ACI-HERZOG is the firm contracted to maintain and operate the Puerto Rico Tren Urbano system. As part of their duties, they are required to wash down train cars periodically. The water generated from the wash down process ...
NPI Workgroups Management System
(Polytechnic University of Puerto Rico, 2021)
Organizations with virtual teams and its resources located in different geographical locations have a growing concern on the impact of turnaround time and work-life balance. As a result, the main challenges are the coverage ...
The Impact of Employee Absenteeism in Fast-Tracks Projects
(Polytechnic University of Puerto Rico, 2021)
Fast-tracking is a project management technique where activities are performed simultaneously, instead of waiting for each task to be completed separately. When personnel do not show for work, it creates a negative impact. ...
OneDay Toric Yield Improvement
(Polytechnic University of Puerto Rico, 2021)
This project was developed in CooperVision, Juana Diaz Site, specifically for the OneDay Toric product. It is focused on the Wet
Process of the product life cycle. There was a gap between two manufacturing technologies ...
SICD Manufacturing Scrap Yield Improvement
(Polytechnic University of Puerto Rico, 2021)
Defects that occur during the manufacture of a product are consider a problem that affects the yield rate of all manufacturing lines
around the world. The Subcutaneous Implantable Cardioverter Defibrillator (SICD) ...
Substation Transformer Replacement Plan
(Polytechnic University of Puerto Rico, 2021)
About half of the Gainesville Regional Utilities (GRU) substation transformers are above their industry usage limit standard of 45 years and are prone to catastrophic failure. This study critical health data was captured ...
Mejora de Proceso en Sumisión de Iniciativas de Innovación Tecnológica en una Organización Gubernamental Federal
(Polytechnic University of Puerto Rico, 2021)
En una agencia gubernamental federal existen varios foros de iniciativas de innovación los cuales promueven la creatividad dirigida hacia la resolución de problemas que beneficien a la misma. Para este proyecto se utilizó ...
Mejoras el proceso de almacenamiento de píldoras en Kalamazoo Pfizer, Michigan
(Polytechnic University of Puerto Rico, 2021)
La esencia de este proyecto era crear un mejor flujo dentro de la sala de almacenamiento de la farmacéutica de Kalamazoo. El objetivo principal fue desarrollar un diseño que redujera el tiempo de búsqueda de píldoras donde ...
Improvement of Manufacturing Line Fill Rate
(Polytechnic University of Puerto Rico, 2021)
Poor fill rates at manufacturing line for models 5038 and 4968 are problems that affected the cost metrics due to overtime and unsatisfaction of our patients around the world. The main cause of this problem is high lead ...