Search
Now showing items 31-40 of 333
Implementation of DMADV in a Body Armor Manufacturing Company
(Polytechnic University of Puerto Rico, 2014)
The incoming inspection area of a
Body Armor Manufacturing Company is
responsible for ensuring all finished products from
subcontractors meet all customer and internal
requirements. This area has been identified as ...
Reducción de defectos visuales en lentes de contacto: Utilizando la Metodología DMAIC
(Polytechnic University of Puerto Rico, 2014)
La crisis económica ha tenido un
gran impacto sobre la actividad industrial. La
industria de dispositivos médicos dedicados a la
manufactura de lentes de contacto no ha sido la
excepción. En busca de lidiar con esta ...
Using Lean Six Sigma Tools to Evaluate Air Travel Delays from Luis Muñoz Marin International Airport in San Juan, P.R.
(Polytechnic University of Puerto Rico, 2014)
There has been an increase in the
demand for air transportation creating more delays
in flights. It is important for Puerto Rico to manage
more efficiently their air transportation to be able
to maintain a continuous ...
Scrap Reduction Evaluation of Filling Equipment and Short-Term Improvement Implementation
(Polytechnic University of Puerto Rico, 2014)
This paper seeks to document an
approach to reduce scrap losses using the Lean Six
Sigma tools for process improvement in a lean
manufacturing environment. The Lean Six Sigma
methodology views lean manufacturing, ...
Aero Repairs Documentation Cycle Time Reduction By Lean Application
(Polytechnic University of Puerto Rico, 2014)
In our daily life and world, with a
diversity of industries and services, from health to
manufacturing, all kind of products; many of them
care apply Lean concepts or tools to perform
important improvements to their ...
Flow-Days Reduction Using Six Sigma Toolbox at Air Force Base Engine Maintenance Center
(Polytechnic University of Puerto Rico, 2012)
Abstract - When the United States entered World War I in 1917, the U.S. government searched for a company to develop the first airplane engine "booster" for the fledgling U.S. aviation industry General Electric accepted ...
Implementación de Manufactura Esbelta en el Proceso de Admisión y Área de Servicio dentro de un Decanato a Nivel Postgrado
(Polytechnic University of Puerto Rico, 2016)
Atrasos en un Decanato a nivel
postgrado durante una matricula puede ocasionar
errores en el proceso. Es necesario definir el por
qué de estas demoras, con el fin de identificar en
cuales puntos se está fallando. De ...
Design Methodology of Production Improvement at “X Hydroponic Farm”
(Polytechnic University of Puerto Rico, 2016)
According to “X Hydroponic Farm”
facilities, a 40 x 60 square feet farm, with a
capacity of producing 750 plants weekly; and
actual production rate of 250 plants a week, is
expecting a demand increase of approximately
60%. ...
Capability of CNC-Mori-Seiki ENDO HEAD
(Polytechnic University of Puerto Rico, 2016)
Endo Head is a product suitable to
perform hemiarthroplasty on any hip joint whose
acetabular conditions are satisfactory. The Endo
Head is a unipolar prosthesis made of CoCr alloy
that consists of a Monobloc prosthetic ...
First Pass Yield Improvement on Audit Results
(Polytechnic University of Puerto Rico, 2016)
This research project was focused in
the First Pass Yield improvement for Quality Audit
results in Aerospace Company. The first pass yield
is defined as the number of units coming out of a
process divided by the number ...