Buscar
Mostrando ítems 211-220 de 271
Validation Exercise for Upgrade of the Systech’s Serialization Program v8.01 at a Packaging Line
(Polytechnic University of Puerto Rico, 2017)
Serialization has been the focus during
the past years due to the new worldwide regulation
related to the track and trace of pharmaceutical
products. Companies dedicated all their efforts
incorporating new technology ...
Creation of a Library for a Religious Organization Using the Lean Six Sigma Methodology
(Polytechnic University of Puerto Rico, 2011)
Abstract - Due to the economic situation during this 21th century, each individual, corporation, industry, service, and any kind of business, is looking for better ideas to improve their day to day jobs. It is not a surprise ...
Design and Implementation of Lean Concepts in the HVAC Construction Industry
(Polytechnic University of Puerto Rico, 2017)
Construction Projects are always
unique, and risks rise from several different sources.
These situations bring new opportunities to improve
critical areas in a project. As a Project Management
approach, certain phases ...
Validation Exercise for Facility GMP HVAC System
(Polytechnic University of Puerto Rico, 2019)
The client developed Technology
Transfer Project to retrofit out of use
manufacturing existing facilities and utilities to
provide adequate area for the commercial
manufacturing of new products. To achieve the
Technology ...
System Performance Laboratory Optimization
(Polytechnic University of Puerto Rico, 2019)
This project seeks to optimize the
efficiency of a medical device laboratory process
applying tools of the Lean Six Sigma methodology
and eliminating non-value activities to complete
transfer of a new product avoiding ...
Filling Process Yield Improvements
(Polytechnic University of Puerto Rico, 2019)
Misus Winery is a wine making and
distribution plant. Its main product is Cherry
Blossom which is a pink wine. The high demand for
its product has created the need to make
improvements in their processes. As part of ...
Coronary Guide Wires Abbott Vascular
(Polytechnic University of Puerto Rico, 2019)
Abbott Vascular produces guide wires
which are designed to navigate vessels to reach a
lesion or vessel segment. Once the tip of the device
arrives at its destination, it acts as a guide so that
larger catheters can ...
Implementación de Proceso de Descarte de Productos Intravenosos en una Planta de Productos Farmacéuticos
(Polytechnic University of Puerto Rico, 2019)
Durante el pasado año, se
descartaron 2.7 millones de unidades debido a
distintos problemas de calidad. Baxter es una
compañía manufacturera de dispositivos médicos
que lleva 60 años en el pueblo de Jayuya, Puerto
Rico. ...
Optimization of a Pharmaceutical Filling Process to Comply with Federal Regulations and Minimize Process Variability
(Polytechnic University of Puerto Rico, 2019)
This article analyzes the scientific
methodology that was followed to solve a problem
that arose in a pharmaceutical installation after a
federal regulatory inspection. The route for a robust
solution was framed by a ...
Time Cycle Reduction of the Scrap Process in a Medical Device Company
(Polytechnic University of Puerto Rico, 2011)
As part of an assessment performed for continuous improvement it was identified that the Nonconformance (NC) Timeline metric shows 23% over the goal of 30 days closure. From the list of NC Reports (NCR) impacting this ...