Suche
Anzeige der Dokumente 1-10 von 21
Development and Evaluation of Prototype Heat Shrink Masking Machine
(Polytechnic University of Puerto Rico, 2016)
This design project consists in
developing a prototype equipment to reduce the
heat variability produced by the current heat shrink
installation process. A heat Shrink tubing is a
shrinkable plastic tubing commonly ...
Cost & Cycle Time Reduction and Increased Production on CNC Machines
(Polytechnic University of Puerto Rico, 2014)
There are a lot of different types of
manufacturing industries. Some of the similarities,
in the majority, is the need to reduce cost, cycle
tyme and consequently increase productivity. There
are several methodologies ...
Tracking System for Useful Life of an Insulin Pump Motor
(Polytechnic University of Puerto Rico, 2016)
This research project was focused in
the implementation of a Tracking System for the
useful life of an infusion pump’s motor. This
component is a sub-assembly of the infusion pump
which is used to deliver fluids into ...
Improvement of the Statistical Techniques Quality System Element in a Medical Device Industry
(Polytechnic University of Puerto Rico, 2012)
Abstract - This project is focused on reducing the compliance risk of a Medical Device Manufacturer by improving its Statistical Techniques Quality System Element. Lean Sigma Methodology was used to identify the inputs or ...
Surgical Technologies Clean Room Lines Capacity Improvement
(Polytechnic University of Puerto Rico, 2015)
In today’s competitive market, medical
device manufacturing companies need to
continuously innovate their products and process in
order to maintain a leader position on the medical
devices industry. Quality and Cost ...
Workmanship Error at Assembly Line in a Medical Device Company
(Polytechnic University of Puerto Rico, 2012)
Abstract — In a Medical Device Company a production line had an increase of non-conformances in 2011. The category for the increase was workmanship error. These failures result in cost of poor quality due to quality holds. ...
Improve Material Flow at Supplier
(Polytechnic University of Puerto Rico, 2012)
Abstract ⎯ This project will be focused in reducing the high lead time that characterizes one of the suppliers in a Medical Device Organization. By reducing the lead time of this supplier, the organization expects to have ...
Quality Improvement Process for Software Controls in Regulated Industry using Six Sigma Methodology
(Polytechnic University of Puerto Rico, 2013)
A regulated industry at medical
devices company, Software Control practices on
Automated Processes are weak and not
systematized. Several findings were found in past
internal audits related to software revision
changes. ...
Improving Steroid Out Of Specification (OOS) Trending on Pacemaker Lead
(Polytechnic University of Puerto Rico, 2013)
The purpose of this project is to
identify a roots cause and potential factors that
influencing Steroid Out Of Specification Results
(OOS) on pacemaker lead model XYZ. Project
involves Define, Measure, Analyze, Improve ...
Reduction of Cosmetic Defects Due to Criteria Misalignment at a Medical Device Manufacturing Line Using DMAIC Methodology
(2013)
For the last few years, the economy of
Puerto Rico has been negatively affected,
increasing the operational cost of the industries in
the Island. The Pharma / Medical Device industry
is not excluded of this situation. ...