    • Waste Handling Optimization: Operation Cost and Environmental Impact Minimization 

      Marrero Torres, Christopher S. (Polytechnic University of Puerto Rico, 2022)
      The company Eli Lilly established environmental goals to reduce waste and manage resources more effectively. From this, the pharmaceutical site in PR underwent a waste generation evaluation of its current operations, to ...
    • WECI Inventory Reduction and Just-In-Time Implementation 

      Centeno Castro, Gabriel L. (Polytechnic University of Puerto Rico, 2020)
      The organization studied showed substantially high levels of inventory, thus a reduction was in need. Given the little information available to implement this in a service environment, a new approach was needed. A mix ...
    • The X Filed and Building Construction Site Approval 

      Gonzalez Rodriguez, Waleska L. (Polytechnic University of Puerto Rico, 2019)
      The Facility Division is currently having an engineering problem considering a site approval for construction. The engineering department need to analyze two locations and determine which one is better for the construction ...
    • X Regrind Usage for TY27MX 

      Vale-Figueroa, Marjorie (Polytechnic University of Puerto Rico, 2021)
      TY27MX is a high-runner catalog from ABB Caribe. Since the first quarter of 2020, high levels of scrap were detected at the production line caused by process variation and inherent conditions. Resin X regrind usage was ...
    • Zero Waiting Time at the Emergency Room 

      Brenes Catinchi, Joanne (Polytechnic University of Puerto Rico, 2013)
      Long waiting times at the Emergency Rooms are a problem that affects every hospital in Puerto Rico. The main causes of this problem are the lack of patients understanding the purpose of the ER and the inefficient use of ...