Improving Steroid Out Of Specification (OOS) Trending on Pacemaker Lead
Abstract
The purpose of this project is to
identify a roots cause and potential factors that
influencing Steroid Out Of Specification Results
(OOS) on pacemaker lead model XYZ. Project
involves Define, Measure, Analyze, Improve and
Control (DMAIC) problem solving methodology.
The objective of the study is to decrease Failure
Test Rate from 15% to 10%. The contribution will
allow the optimization of the steroid application
process, by control the potential factors that
contribute the (OOS) results. This project might be
used as benchmark to implement similar problem
solving techniques around the manufacturing plant
or as a model for other educational needs.
Key Terms ⎯ Combination Products, Out of
Specification Trending, Pacemaker Lead, Steroid.